www.canovate.com
l
l
P. +90 216 484 2222
Can BREE
ZE
Operating and Maintenance Cooling Unit Instructions 8-14 kW
l
45
Factory setting
(Setting for the last digit).
0
9
8
7 6 5 4
3
2
1
1 2
DSW5
1 2
DSW5
1 2
DSW5
1 2
DSW5
( H-LINK)
( H-LINK)
( H-LINK)
18.7.4
System installation DIP Switch
Setting
Dip Switch Setting of Indoor PCB and Outdoor PCB
for H-LINK II
It is required to set dip switches of every indoor unit
and outdoor unit and match of the transmission circuit
impedance.
•
Dip Switch Setting Example: