DTMF Transmission Test ----------------------------------------------------------------5-20
V.34 G3 Signal Transmission Test (V34G3Tx) -------------------------------------5-21
Function Test -----------------------------------------------------------------------5-21
4800-bps Signal Transmission Test ---------------------------------------------------5-21
Service Report (REPORT) ------------------------------------------------ 5-22
System Data List ------------------------------------------------------------------5-22
System Dump List ----------------------------------------------------------------5-22
Error Transmission Report ------------------------------------------------------5-23
How to Check this Installation Procedure -------------------------------6-2
Check Item when Turning OFF the Main Power ----------------------6-2
Installation Outline Drawing ------------------------------------------------6-2
Checking the Contents ------------------------------------------------------6-3
Installation Procedure --------------------------------------------------------6-5
Installation Procedure (iR-ADV C5051/C5045/C5035/C5030 Series) 6-5
Installation Procedure (iR-ADV C9075 PRO/C9070 PRO/C9065 PRO/
C9060 PRO Series, iR-ADV C7065/C7055 Series) ----------------------6-10
Removing the Super G3 2nd Line Fax Board --------------------------------------6-10
Installing the Super G3 3rd/4th Line Fax Board -----------------------------------6-13
Installation Procedure (iR-ADV 6075/6065/6055 Series, iR-ADV
8105/8095/8085 Series) ---------------------------------------------------------6-16
Installation Procedure (iR-ADV 4051/4045/4035/4025 Series) -------6-19
Checking the Operation ---------------------------------------------------------6-23
Type Settings -------------------------------------------------------------------------------6-23
Basic Settings ------------------------------------------------------------------------------6-23
FAX communication test -----------------------------------------------------------------6-24