4-7
4
■
Stapling operation
1.Outline
Stacking the ejected paper from the host machine onto the processing tray.
Stapling and ejecting the paper stack on the stack tray.
2.Details
Outline of operation
"Angle stapling at 1 front corner", "Angle stapling at 1 rear corner" and "Double stapling (side
stitching)"
1) 1) through 7) are the same operation as the offset operation.
8) Gripper conveys the paper stack to the stapling position with holding the stack.
"The operation 9) and 10) are applicable only to the front/ rear corner stapling."
9) After stapling the paper stack, the gripper starts to eject the stack on the stack tray.
10) At the same time, the stacking height detection lever moves up.
The detection lever moves down when the paper stack has ejected on the stack tray to
detect the paper.
"The operation 9)' through 18) are applicable only to the double stapling (side stitching)."
9)The shift roller moves down and gives higher pressure to the paper stack. Gripper then
opens and evacuates itself to the connecting position with the stapler.
Stack tray
Stack height detetion lever
Stapler
Gripper
Gripper evacautes
itself to the connecting position
Shift roller
Higher nip pressure
[Gripper evacuating operation]
F-4-7
Gripper opens
Shift roller nip
Gripper evacuating
and connecting to the stapler
Gripper unit rail
connecting
mechanism-2
Shift roller nip
connecting mechanism-1
[Gripper evacuating operation (Top view)]
10) When the gripper closes, the connecting lever moves downward to connect the stapler
and the gripper to each other, so the stapler can travel back and forth.
11) Stapler unit travels to its first stapling position to execute stapling.
12) Stapler unit travels to its second stapling position to execute stapling.
Stapling (first)
Stapling (second)
The stapler unit and the gripper unit move with connecting
to each other and execute the stapling operation.
F-4-8
Содержание Perfect Binder D1
Страница 1: ...5 4 3 2 1 Inner Finisher D1 Inner Finisher Additional Tray A1 Service Manual Digest Rev0...
Страница 4: ...0 0 4...
Страница 6: ...Safety Precautions Notes Before it Works Serving...
Страница 8: ...1 1 Periodic Servicing Periodic Service Works Finisher...
Страница 10: ...2 2 Adjustment Basic Adjustment Adjustment at Time of Parts Replacement finisher...
Страница 14: ...3 3 Parts Placement Diagram List of Parts Finisher...
Страница 25: ...5 5 General Circuit Diagram Service Tools General Circuit Diagram Finisher...