5
5
31
31
Installation > Machine Relocation Work
Installation > Machine Relocation Work
Machine Relocation Work
When relocating this machine to another place, carry out the following work.
1) Turn off the host machine following the shutdown sequence, and then remove the power plug
(from the outlet).
2) Remove the interface cover, and then disconnect the interface cable.
3) Disconnect the shunt cable.
4) Loosen the screws securing the delivery guide, raise the delivery guide, and then tighten the
screws firmly.
5) Release the front and rear latches.
6) Raise the two stoppers fully until they lock.
F-5-78
F-5-78
F-5-79
F-5-79
7) Remove the roller support plate from the lower deck.
x2
8) Remove the separation roller nip cam from each deck.
x1
F-5-80
F-5-80
F-5-81
F-5-81
Содержание Paper Deck-AF1
Страница 4: ...0 0 0 4 0 4 ...
Страница 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts Explanation of Basic Op erations ...
Страница 16: ...2 2 Technology Technology Basic Configuration Controls ...
Страница 40: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic Service Works ...
Страница 158: ...6 6 Appendix Appendix Service Tools General Circuit Diagram ...