5
5
9
9
Installation > Unpacking Procedure
Installation > Unpacking Procedure
8
8) Remove the two pins secured to the slope plate with tape.
9
9) With the pin hole in the palette aligned with the pin hole in the slope plate, insert a pin.
Carry out this step for the other slope plate.
10
10) Remove tapes from the left-side casters (front and rear) of this equipment.
F-5-12
F-5-12
F-5-13
F-5-13
F-5-14
F-5-14
Содержание Paper Deck-AF1
Страница 4: ...0 0 0 4 0 4 ...
Страница 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts Explanation of Basic Op erations ...
Страница 16: ...2 2 Technology Technology Basic Configuration Controls ...
Страница 40: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic Service Works ...
Страница 158: ...6 6 Appendix Appendix Service Tools General Circuit Diagram ...