5
5
8
8
Installation > Unpacking Procedure
Installation > Unpacking Procedure
5
5) Lift the left side of the equipment and remove the cushioning material from the bottom. Pull the plastic
bag to the right side in advance.
MEMO:
A reinforcing plate is attached to the cushioning material. Since the reinforcing plate is
no longer needed, remove it together with the cushioning material.
F-5-22
F-5-22
6
6) Lift the right side of the equipment, and then remove the cushioning material and plastic bag from
the bottom.
7
7) Pull out the two slope plate from the center of the palette.
F-5-9
F-5-9
F-5-10
F-5-10
F-5-11
F-5-11
Содержание Paper Deck-AF1
Страница 4: ...0 0 0 4 0 4 ...
Страница 10: ...1 1 Product Outline Product Outline Features Specifications Names of Parts Explanation of Basic Op erations ...
Страница 16: ...2 2 Technology Technology Basic Configuration Controls ...
Страница 40: ...3 3 Periodic Servicing P e r i o d i c Servicing Periodic Service Works ...
Страница 158: ...6 6 Appendix Appendix Service Tools General Circuit Diagram ...