6-4
6-4
6
6
Installation
Installation
Installation procedure
Unpacking
CAUTION:
Since this machine weights approx. 40 kg, it is necessary to have 2 persons to lift it. And keep the machine in the horizontal line when lifting it.
1
1) Unpack, take out the equipment from the package box, and put it above the box.
MEMO:
Shift it approx. 70 mm off the
box.
70 mm
70 mm
2
2) Remove the tape from the equipment.
MEMO:
Do not to remove the tag yet.
MEMO:
Do not to remove the tag yet.
■
Содержание L1
Страница 4: ...BLANK PAGE ...
Страница 10: ...BLANK PAGE ...
Страница 11: ...2 2 2 Technology Technology Technology Basic configuration Controls ...
Страница 31: ...3 3 3 Periodic Service Periodic Service Periodic Servicing Periodic Servicing List ...
Страница 41: ...5 5 5 Adjustmnet Adjustmnet Adjustments Overview Adjustment Method ...
Страница 49: ...6 6 6 Installation Installation Installation Color Image Reader L1 ...
Страница 78: ...Service Tools General Circuit Diagram Appendix Appendix Appendix ...