Unpacking
Unpacking Procedure
NOTE:
This equipment is packed using tapes, fixings and cushioning materials to be protected vibration and shock during transportation.
Be sure to remove all the fixing materials and the tapes before starting to install this equipment. It is a good idea to store away
theremoved fixings and cushioning materials for possible relocation of this equipment, e.g., to new site or for repairs.
1. Take out the finisher from the carton.
NOTE:
The weight of this equipment is about 7kg.
2. Remove all the tapes and the cushioning materials outside this equipment.
3. Open the Front Cover. Remove the 2 fixing materials and all the tapes of the stapler unit.
4. Close the Front Cover.
6. Installation
80
Содержание Inner Finisher-J1
Страница 10: ...Product Overview 1 Features 5 Specifications 6 Name of Parts 9 ...
Страница 45: ...Periodical Service 3 List of Work for Scheduled Servicing 40 ...
Страница 78: ...Adjustment 5 Overview 73 Adjustment when Replacing the Parts 75 Service Label 77 ...
Страница 88: ...Installation Outline Drawing 1 2 3 4 5 8 9 10 11 6 7 12 6 Installation 82 ...
Страница 99: ...APPENDICES Service Tools 94 General Circuit Diagram 95 ...