9.3 Basic Sequence
9.3.1 At Power-On (1)
If the main power switch is turned on while the surface temperature of the fixing roller is less than 100°C
(e.g., first time in the morning or after a long period of no use),
Characteristics
- the same control timing is used for the Y, M, C, and Bk drum units.
- the machine takes about 300 to 360 sec before it enters PSTBY.
T-9-16
- the machine executes image stabilization control in the following order while it is warming up:
discharge current level control
ATVC control
ATR control
SALT-Dmax control
image position control
SALT-Dhalf control
F-9-6
iRC5180
iRC4580
iRC4080
100V
240sec
300sec
300sec
120V
240sec
270sec
270sec
230V
240sec
240sec
240sec
1 :
iR C5180
iR C4580/2880 (230V) 0sec
2 :
3 :
Main power
switch ON
WMUPR
CNTR
Approx. 27 to 120sec
Approx. 10sec
Approx. 80sec
1
2
PSTBY
Start-up sequence of the drum unit (Y; with surface temperature of fixing roller Less than 100
).
Drum/ITB
motor (M1)
Exposure (Y)
Charging (DC)
bias (Y)
Development
motor (Y)
Developing (DC)
bias (Y)
Developing (AC)
bias (Y)
Upstream auxiliary (DC)
bias (Y)
Upstream auxiliary (AC)
bias (Y)
Downstream auxiliary (DC)
bias (Y)
Primary transfer
bias (Y)
Secondary
transfer bias
Charging (AC)
bias (Y)
Cleaning by second-
ary transfer roller
Scraping off toner
by auxiliary brush
Scraping off toner
by auxiliary brush
Image stabilization
control (for details,
see appropriate sections)
Approx. 80sec
Содержание Color imageRUNNER C4580
Страница 22: ...Chapter 1 INTRODUCTION ...
Страница 64: ...Chapter 2 INSTALLATION ...
Страница 110: ...Chapter 3 BASIC OPERATION ...
Страница 119: ...Chapter 4 BASIC OPERATIONS AS A PRINTER ...
Страница 129: ...Chapter 5 MAIN CONTROLLER ...
Страница 132: ...Chapter 5 5 2 F 5 1 A Reader Unit B DC controller Circuit Board C Printer Unit A B C HDD 1 2 3 3 4 5 6 7 8 9 ...
Страница 138: ...Chapter 5 5 8 F 5 8 CPU HDD ROM access to the program at time of execution ...
Страница 165: ...Chapter 6 ORIGINAL EXPOSURE SYSTEM ...
Страница 209: ...Chapter 7 IMAGE PROCESSING SYSTEM ...
Страница 210: ...Contents Contents 7 1 Digital Image Processing 7 1 7 1 1 Overview 7 1 7 1 2 Shading Correction 7 1 ...
Страница 212: ...Chapter LASER EXPOSURE 8 ...
Страница 239: ...Chapter 9 IMAGE FORMATION ...
Страница 324: ...Chapter 10 PICKUP FEEDING SYSTEM ...
Страница 355: ...Chapter 10 10 28 F 10 30 F 10 31 9 1 2 3 4 5 1 2 3 4 5 10 thereafter repeats 7 through 10 11 1 2 3 4 5 12 1 2 3 4 5 ...
Страница 358: ...Chapter 10 10 31 F 10 36 F 10 37 5 1 2 6 1 2 in wait for re pickup point of reversal 9 1 2 3 10 1 2 3 ...
Страница 435: ...Chapter 11 FIXING SYSTEM ...
Страница 460: ...Chapter 11 11 23 F 11 13 SEN3 SEN2 SEN1 SEN2 SEN3 SEN1 SEN2 SEN3 SEN1 ...
Страница 491: ...Chapter 12 EXTERNALS CONTROLS ...
Страница 498: ...Chapter 12 12 5 F 12 2 FM1 FM7 FM9 FM2 FM13 FM14 FM12 FM11 FM10 FM5 FM3 FM4 FM8 FM6 ...
Страница 512: ...Chapter 12 12 19 2 Remove the check mark from SNMP Status Enabled F 12 10 ...
Страница 553: ...Chapter 13 MEAP ...
Страница 557: ...Chapter 14 RDS ...
Страница 569: ...Chapter 15 MAINTENANCE INSPECTION ...
Страница 578: ...Chapter 16 STANDARDS ADJUSTMENTS ...
Страница 597: ...Chapter 17 CORRECTING FAULTY IMAGES ...
Страница 612: ...Chapter 17 17 14 F 17 7 PLG1 ELCB1 SP1 H4 H3 H2 H1 H1 H2 LA1 ...
Страница 617: ...Chapter 18 SELF DIAGNOSIS ...
Страница 644: ...Chapter 19 SERVICE MODE ...
Страница 778: ...Chapter 20 UPGRADING ...
Страница 823: ...Chapter 21 SERVICE TOOLS ...
Страница 824: ...Contents Contents 21 1 Service Tools 21 1 21 1 1 Special Tools 21 1 21 1 2 Solvents and Oils 21 2 ...
Страница 828: ...APPENDIX ...
Страница 851: ......