
4
4
4-12
4-12
Parts Replacing and Cleaning > Disassembly/Assembly > Removing the Vertical Path Unit > Procedure
Parts Replacing and Cleaning > Disassembly/Assembly > Removing the Vertical Path Unit > Procedure
5) Remove the Vertical Path Unit [1].
• 2 Shafts [2]
[1]
[2]
[2]
F-4-28
NOTE: How to install the Arm Holder
1) Align the 2 bosses [3] of the Arm Holder with the 2 holes [A] of the Vertical Path
Unit.
2) While closing the Vertical Path Unit [1], align the hole [B] of the Arm Holder with the
shaft [2], and keep on being similar. Then, secure the holder with the screw removed
in step 3.
[1]
[2]
[3]
[B]
[A]
F-4-29
Содержание AG1
Страница 5: ... Notes Before it Works Serving Safety Precautions ...
Страница 7: ...1 1 Product Outline Product Outline Outline Names of Parts ...
Страница 10: ...2 2 Technology Technology Basic configuration Controls ...
Страница 22: ...3 3 Periodic Servicing Periodic Servicing Periodic Servicing List ...
Страница 24: ...4 4 Parts Replacing and Cleaning Parts Replacing and Cleaning List of Parts Disassembly Assembly ...
Страница 45: ...5 5 Adjustment Adjustment Pickup Feed System ...
Страница 52: ...6 6 Installation Installation Installation Installing this Equipment ...
Страница 54: ... Service Tools General Circuit Diagram Appendix ...