9
9
9-2
9-2
Installation > Option Installation Sequence
Installation > Option Installation Sequence
How to check this Installation Procedure
When Using the parts included in the package
A symbol is described on the illustration in the case of using the parts included in the package
of this product.
Symbols in the Illustration
The frequently-performed operations are described with symbols in this procedure.
Connector
Disconnect
Screw
Tighten
Remove
Connect
Secure
Free
Harness
Push
Insert
Plug in
Turn on
Sound Check
Check
Visual Check
Claw
Remove
Checking instruction
F-9-1
F-9-2
Installation
This machine is installed by the user.
For details of installation procedure, refer to the User's Manual.
Option Installation Sequence
When installing options of this machine, be sure to note the following points.
1) When installing the Drum Heater-D1, be sure to install it first.
2) When installing the Copy Card Reader-F1 or USB Application 3-Port Interface Kit-B1 and
Super G3 Fax Board-AJ1 at the same time, be sure to install the Copy Card Reader-F1 or
USB Application 3-Port Interface Kit-B1 first.
3) Be sure to install the Super G3 Fax Board-AJ1 last.
Содержание 1730
Страница 12: ...Update Firmware XXV Volume Control XXV Backup Data XXVI ...
Страница 17: ...1 1 Product Overview Product Overview Product Lineup Features Specifications Parts Name ...
Страница 211: ...5 5 Adjustment Adjustment Overview Adjustment when Replacing the Parts Image Position Adjustment ...
Страница 235: ...7 7 Error Code Error Code Overview Error Code Jam Code Alarm Code ...
Страница 250: ...8 8 Service Mode Service Mode Outline Details of Service Mode ...
Страница 333: ... Service Tools General Timing Chart General Circuit Diagram List of User Mode Appendix ...