16. Main heat exchanger
Carry out step 1 and 2 as above. Drain
down the boiler as in step 11. Unscrew
three screws securing the air/gas con-
nection pipe onto the gas valve assem-
bly. Disconnect Ionisation and lighting
electrodes from their wiring. Unscrew six
nuts to release combustion chamber
front panel and pull the assembly
towards you. Undo the two clips of the
pipes to the main exchanger and pull
down the pipes. Unscrew the three
screws located at the bottom, top left
and at the right with the retaining system
to be able to pull the main heat exchang-
er towards you.
Reassemble in reverse order taking care
about the location of the gasket on the
fumes collector and replace the neces-
sary gaskets.

17. Pump 
Drain boiler as in step 11. Pivot the elec-
tical box downwards. Open the electrical
box cover removing the 2 screws.
Remove the pump plug from the power
board and earth plug from earth socket.
Unscrew the nut of the return pipe
from the volute. Remove the clip on
the pump volute and pull the pump
toward you. Reassemble in reverse
order.

18. Pressure relief valve
The pressure relief valve can be ser-
viced from the front of the appliance.
Drain the boiler first, undo the retaining
screw and pull out the
valve.Reassemble in reverse order.

19. Thermistor
Drain the boiler as step 11. Disconnect
the plug, remove the retaining clip pull
the thermistor out. Reassemble in
reverse order.

21 = Heating thermistor

20. Safety thermostat
Remove the casing as step 1 and hinge
down the electrical box as step 5.
Disconnect the 2 cables, pull out the
sensor with the clip (23). Reassemble in
reverse order.

21. Spark generator
Carry out step 1 and 2 as above. Unplug
the connector from the spark generator
located on the right hand side of the
main heat exchanger. Loosen the two
screws to remove the igniter.
Reassemble in reverse order.

22. Main control board
Carry out step 1 as above and hinge
down electrical box by pressing the
retaining tabs 

on either sides. Remove

wiring cover C. Undo the 4 screws of the
electrical rear panel and remove it.
Unplug all cables from the PCB, remove
earth plug from earth socket. Hang out
the main PCB. Reassemble in reverse
order.

23. Display PCB
Carry out step 1 as above and hinge
down electrical box by pressing the
retaining tabs P on either sides. Remove
the pressure gauge clip. Rotate the elec-
trical box back in upper position. Undo
the 2 screws retaining the front panel,
put your two hands at the bottom of the
front panel and pull it down to release it
from the 2 clips. Hinge down again the
electrical box. Undo the 4 screws of the
electrical rear panel and remove it.
Unplug the display board cables from
the main PCB. Reassemble in reverse
order.

24. Expansion vessel
Remove the casing as step 1 and drain
the boiler as step 12 above. Unscrew the
connecting tails nuts and lift out the boil-
er from the wall. Place it on a side on the
floor. Remove the expansion vessel
bracket retaining screws, disconnect the
pipe from the vessel and pull it toward
you. Reassemble in reverse order.

25. Pressure gauge
Carry out step 1 as above and drain the
boiler as step 12. Hinge down electrical
box by pressing the retaining tabs P on
either sides. Press on the clip to remove
it and pull it out. Remove the clip which
hold the connection of the capillary on
the pump hose. Hang out the pressure
gauge with its capillary. Reassemble in
reverse order.

F

G

21

23

P

P

C

Содержание 24

Страница 1: ...80 60 maxi 8 24 kW 9 28 kW C H operating temperature 80 C max 80 C max C H circuit pressures Min operating 0 7 bar 0 7 bar C H circuit pressures Max operating 2 5 bar 2 5 barr Safety discharge 3 bar...

Страница 2: ...F GVO PVF PVO Pump head available Minimum flow rate with all heating thermostatic valves closed bar 0 1 3 4 1 2 3 4 5 6 8 11 12 13 14 17 7 15 10 9 16 1 Steel chassis complete with expansion vessel not...

Страница 3: ...e temperature when weather is cold press to reduce temperature when weather is fair During the temperature setting operation the display will flash If the room thermostat is calling for heat a dot wil...

Страница 4: ...ether and shut off the gas The red lockout indicator led 35 will light Press the reset button to re light the burner The central heating flow temperature is controlled by the central heating control t...

Страница 5: ...5 CENTORA GREEN FUNCTIONAL DIAGRAM 49 48 43 41 19 16 39 37 21 23 18 14 13 12 6 3 8 5 7 DIAGRAM ELECTRICAL WIRING...

Страница 6: ...de from 01 to 99 Menu 2 Boiler conditions Indicates the conditions or the configurations of the boiler Section Digit 1 Digit 2 and 3 Software version of display PCB 0 10 to 99 Flue type 2 1 FF variabl...

Страница 7: ...Pump post circulation duration 2 0 0 min From 0 to 5 minutes by step of 0 5 min 2 0 5 min 2 1 0 min 2 5 0 min Maximum Central Heating flow temperature 4 50 C 4 80 C CH anti cycling delay 8 0 0 min Fr...

Страница 8: ...ng on the combustion rate to maximum output set in menu 4 sec tion 9 Central heating temperature is dis played in celsius degrees The 3 dots indicate that the combus tion rate control is ON at maximum...

Страница 9: ...pump and burner change for section 9 Adjustment of CH heat output Press on key on Right side 9 times The display shows 906 which corresponds to the 18 kW which is the factory setting 9 section 9 06 18...

Страница 10: ...and the different transformers in the sealed chamber Check combustion chamber insulation panels for damage Check the lighting and ionisation electrodes condition Clean the burner Never use metallic br...

Страница 11: ...connection pipe onto the gas valve assembly Disconnect the connec tors from gas solenoids and fan Loosen the gas pipe nut Unscrew six nuts to release combustion chamber front panel and pull the assem...

Страница 12: ...rse order 21 Spark generator Carry out step 1 and 2 as above Unplug the connector from the spark generator located on the right hand side of the main heat exchanger Loosen the two screws to remove the...

Страница 13: ...minute if the error code 24 still display check the connection fan or replace the fan Yes Yes Yes Yes Yes No No No No Ok No Ok Replace heating thermistor Check heating thermistor Ok No No No No Yes Ye...

Страница 14: ...displayed Replace control PCB Replace display PCB or control the connection between the 2 PCBs No No Yes No No Does the orange LED light No Yes Yes Yes Yes No 3 Replace display PCB or control the conn...

Страница 15: ...10 T1 SW1 RL8 RL7A RL7 RL6 RL10 RL5A RL5 RL4A RL4 RL3A RL3 RL2A RL1A RL9 RL1 RAD1 R118 R114 R113 R111 R112 R110 R109 R108R107 R106 R9 R105 R101 R100 R99 R98 R97 R96 R8 R95 R94 R93 R92 R90 R88 R66 R65...

Страница 16: ...in this document Manufacturer Chaffoteaux Maury France Commercial subsidiary MTS GB Limited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet...

Отзывы: