Any data, descriptions or specifications presented herein are subject to revision by C&D Technologies, Inc. with-
out notice. While such information is believed to be accurate as indicated herein, C&D Technologies, Inc. makes
no warranty and hereby disclaims all warranties, express or implied, with regard to the accuracy or completeness
of such information. Further, because the product(s) featured herein may be used under conditions beyond its
control, C&D Technologies, Inc. hereby disclaims all warranties, either express or implied, concerning the fitness
or suitability of such product(s) for any particular use or in any specific application or arising from any course of
dealing or usage of trade. The user is solely responsible for determining the suitability of the product(s) featured
herein for user’s intended purpose and in user’s specific application.
Copyright 2007 C&D TECHNOLOGIES, INC. Printed in U.S.A. 12-334 5M/0107/TD/3
1400 Union Meeting Road
P.O. Box 3053 • Blue Bell, PA 19422-0858
(215) 619-2700 • Fax (215) 619-7899 • (800) 543-8630
www.cdtechno.com
Back to Back Assembly:
Where two rows of racks are required, two rack assemblies may be
installed in parallel front to back.
Frame Location:
Locate back to back frames relative to each other as shown, such
that the rear cross brace attachment holes align for the two adjoining
frames. All braces must be installed, as described previously, except
that a single bolt may be used to connect the front and rear frames
and respective cross braces. Use 3/16” spacers and/or washers to
fill gaps between adjacent frames. See figure 10.
End to End Rack Installation Instructions:
Where a continuous rack string is required, two racks may be
installed adjacent in length.
Frame Location:
End to end rack assemblies are installed as two individual, stand-
alone rack assemblies as shown. When installing standard racks,
the minimum clearance between racks is 0”. When installing EP
racks the two racks must be spaced apart so that the minimum
distance between the ends of the support rails is 5”. See Figure 11.
AddItIonAl InstRuctIons FoR
MultI-RAck ARRAngEMEnts
Figure 10. Back to Back Assembly
Front of Rack B
Back of Racks A and B
Front of Rack A
Figure 11. End to End Installation
5” Min. Between
End to End EP Racks