background image

.9.

.8.

CAUTION 

Risk of electric shock from energy stored in the inverter's capacitors. 
Do not remove cover until five (5) minutes after disconnecting all sources 
of supply have passed, and this can only be done by a service technician. 
The warranty may be voided if any unauthorized removal of cover occurs.

CAUTION

The inverter's surface temperature can reach up to 75

 . To avoid 

risk of burns, do not touch the surface when the inverter is operating. 
Inverter must be installed out of the reach of children.

WARNING

 

The inverter can only accept a PV array as a DC input. Using any other 

type of DC source could damage the inverter.

The inverter has been constructed according to applicable safety and technical guidelines. 

Use the inverter in installations that meet the following requirements ONLY:

       1).  The inverter must be permanently installed.

       2).  The electrical installation must meet all the applicable regulations and standards.

       3).  The inverter must be installed according to the instructions stated in this manual.

       4).  The system design must meet inverter specifications.

       5).  The inverter can only be used for industrial.

To start-up the inverter, the Grid Supply Main Switch (AC) must be turned on, BEFORE the DC 

Switch is turned on. To stop the inverter, the Grid Supply Main Switch (AC) must be turned off 

before the DC Switch is turned off.

2.3 Notice for use

2. Safety Instructions

3.1 Environmental considerations

3.1.1 Select a location for the inverter

When selecting a location for the inverter, consider the following:

●  The temperature of the inverter heat-sink can reach 

75℃

.

●  The inverter is designed to work in an ambient temperature range between 

-25 

to

 60℃

.

●  If multiple inverters are installed on site, a minimum clearance of 500mm should be kept between 

    each inverter and all other mounted equipment. The bottom of the inverter should be at least 500mm 

    above of the ground or floor (see Figure 3.1).

●  The LED status indicator lights and the LCD located on the inverter's front panel should not be 

     blocked.

●  Adequate ventilation must be present if the inverter is to be installed in a confined space.

Figure 3.1 Distances required between inverters

NOTE

 

Nothing should be stored on or placed against the inverter.

3. Installation

To meet relevant codes and standards, the Canadian Solar three phase inverter line is 

equipped with protective circuitry and controls.

Anti-Islanding Protection: 

       Islanding is a condition where the inverter continues to produce power even when the grid 

       is not present.  Circuitry, along with firmware, has been designed to determine if the grid is 

       present by adjusting the output frequency of the inverter.  In the case of a 60Hz resonant 

       system where the inverter is partially isolated from the grid, the inverter programming can 

       detect if there is a resonant condition or if the grid is actually present.  It can also 

       differentiate between inverters operating in parallel and the grid.

2.4 Protection Circuitry and Controls

      

  

 WARNING:

 Risk of fire

 

Despite careful construction, electrical devices can cause fires.

   Do not install the inverter in areas containing highly flammable materials or 

   gases.

   Do not install the inverter in potentially explosive atmospheres. 

10

00

mm

500mm

500mm

500mm

800mm

Содержание CSI-50K-T400GL03-E

Страница 1: ...Sales Inquiries Email sales au csisolar com Customer Support Email service au csisolar com South East Asia 101 Thompson Road 15 03 United Square Singapore 307591 P 65 6572 905 F 65 6559 4690 Sales In...

Страница 2: ...1 Start up procedure 6 2 Shutdown procedure 39 39 39 7 1 Main Menu 40 40 7 2 Information 4 1 Inverter monitoring connection 28 7 Normal operation 40 4 2 DRM Connection Logic Interface Connection 31 7...

Страница 3: ...ontact your local Canadian Solar distributor Cross screws M4 14 x4 Cross Recessed Hexagon Bolt M6 12 x2 User manual x1 Manual AC terminal cover x1 4pin COM Port 16pin COM Port 16pin COM Connector x1 U...

Страница 4: ...nal box to repackage the inverter seal with adhesive tape with the desiccant inside the box Store the inverter in a clean and dry place free of dust and dirt The storage temperature must be between 40...

Страница 5: ...following The temperature of the inverter heat sink can reach 75 The inverter is designed to work in an ambient temperature range between 25 to 60 If multiple inverters are installed on site a minimu...

Страница 6: ...electricity supply the sound level from the inverter can be quite high 3 2 Product handling Figure 3 3 Handles used to move the inverter shown circled in red 3 1 2 4 Air circulation Do not install in...

Страница 7: ...ally The steps to mount the inverter are listed below 1 Refer to Figure 3 6 drill holes for expansion bolt M10 90 based on the hole diameter of bracket using a precision drill keeping the drill perpen...

Страница 8: ...from vertical Figure 3 10 Wrong installation Angle The steps to mounted to the rack are listed below 3 Install mounting plate 1 Remove the bracket and fasteners from the packaging Mark the position f...

Страница 9: ...he Grid Supply Main Switch AC OFF 2 Switch the DC Isolator OFF 3 Connect the inverter to the grid 4 Assemble PV connector and connect to the Inverter Inverter design uses PV style quick connect termin...

Страница 10: ...nding 2 Prepare OT terminals M10 To effectively protect the inverter two grounding methods must be performed Connect the AC grounding cable Please refer to section 3 4 3 Connect the external grounding...

Страница 11: ...MAKE SURE the polarity of the PV array output conductors matches the DC and DC terminal labels before connecting these conductors to the terminals of the inverter 5 Measure PV voltage of DC input wit...

Страница 12: ...urrent protection device must be used between the inverter and the grid 3 4 3 1 Connecting the inverter to the utility grid All electrical installations must be carried out in accordance with the loca...

Страница 13: ...of the OT terminal then use a hydraulic crimp tool to crimp the terminal The crimped portion of the terminal must be insulated with heat shrinkable tube or insulating tape 1 Strip the end of AC cable...

Страница 14: ...12 5 13 6 14 7 15 8 16 Meter RS485 B DRM 2 6 COM1 485 A DRM 3 7 COM1 485 B DRM 4 8 RefGen COM2 485 A Com DRM0 COM2 485 B V 12V V GND Figure 4 1 16pin COM Connector The following is the assembly diagra...

Страница 15: ...or one to multiple datalogging boxes including WiFi box and GPRS Box for the monitoring of multiple inverters Please refer to corresponding manuals for details 4 1 1 Monitoring for a single inverter E...

Страница 16: ...between Pin13 and Pin14 the inverter will reduce its output power to zero within 5s Figure 4 10 Pin Definition 13 14 RefGen Com DRM0 After wiring connection of DRM or Logic interface please refer to s...

Страница 17: ...n Connector 4 3 Meter Connection The inverter can work with a three phase smart meter to achieve Export Power Management function and or 24hour consumption monitoring function The Pin 1 and Pin 2 of t...

Страница 18: ...service technicians only The inverter is customized according to the local grid standard before shipping There should be no requirement to set the standard NOTE The User Def function can only be used...

Страница 19: ...the inverter see Specifications in section 10 may damage the inverter Although Canadian Solar inverters feature reverse polarity protection prolonged connection in reverse polarity may damage these p...

Страница 20: ...s start up voltage the inverter will turn on The red DC POWER LED and LCD will be continuously lit 4 Canadian Solar inverters are powered from the DC side When the inverter detects DC power that is w...

Страница 21: ...1 Information list Status Generating Power 0000W Grid Frequency F_Grid 00 00Hz Total Energy 0000000 kwh This Month 0000kwh Last Month 0000kwh Today 00 0kwh Yesterday 00 0kwh 10 sec 10 sec 10 sec 10 s...

Страница 22: ...arm Message 2 Running message 3 Version 4 Daily Energy 5 Monthly Energy 6 Yearly Energy 7 Daily Records 8 Communication Data 9 Warning Message The following submenus are displayed when the Settings me...

Страница 23: ...history of changing settings Only for maintance personel 7 Normal operation 7 Normal operation 7 4 3 Version The screen shows the model version of the inverter And the screen will show the software v...

Страница 24: ...ea is for fully qualified and accredited technicians only Please follow 7 4 to enter password to access this menu Select Advanced Settings from the Main Menu to access the following options 1 Select S...

Страница 25: ...ed to set the new password for menu Advanced info and Advanced information Figure 7 20 Set new password YES ENT NO ESC Password 0000 Enter the right password before set new password Press the DOWN key...

Страница 26: ...ystem Zero injection can be achieved Smart meter can be installed either on the grid side OR the load side 7 5 8 STD Mode Settings 1 Working Mode Set 2 Power Rate Limit 3 Freq Derate Set 4 10mins Volt...

Страница 27: ...ion For other regions customers can enable or disable the function as they desire NOTE When the failsafe function is ON and CT Meter is disconnected somehow the inverter will stop generation and give...

Страница 28: ...als to one of three phase load power that is the lowest load power of a certain phase Figure 7 30 Inverter Meter 7 5 13 Restart HMI The function is used for restart the HMI This function is applicable...

Страница 29: ...Test Figure 7 32 Selecting Fan Test displays the sub menu shown below Are you sure YES ENT NO ESC Fan Test is a factory test function Press the ENTER key to start the test Press the ESC key to return...

Страница 30: ...r damages caused by unauthorized modifications NOTE The setting corresponds to the current status as well which can be used to inspect the ON OFF state of the AFCI function 7 6 2 Arc Fault During the...

Страница 31: ...xed 2 Check if the DSP connector to power board are fixed 1 Check inverter surrounding ventilation 2 Check if there s sunshine direct on inverter in hot weather 1 Use user define function to adjust th...

Страница 32: ...ing current down below 0 5A Turn off the two DC switchs and fix the polarity issue Screen OFF with DC applied Inverter internally damaged 1 Do not turn off the DC switches as it will damage the invert...

Страница 33: ...umber Max input strings number Rated grid voltage Volts Power Factor at rated output power Max efficiency EU efficiency Topology Self consumption night Operating ambient temperature range Relative hum...

Страница 34: ...70 71 11 Declarations 11 1 REACH Declaration 11 Declarations...

Страница 35: ...72 11 Declarations 11 Declarations 73 11 2 CE and RoHS Declaration...

Страница 36: ...11 Declarations 74...

Страница 37: ...ances and are properly ventilated Completed 5 Serial number Record the product serial numbers located on the side label Serial Numbers attached list 6 Solar modules Confirm PV module installation comp...

Страница 38: ...he grid supply main Switch AC ON first 2 Switch the DC switch ON If the voltages of PV arrays are higher than start up voltage the inverter will turn on The red LED power will be continuously lit 3 Wh...

Страница 39: ...face Completed Record current date time in Notes 6 Communication setting if avail Set communication with a unique address for each inverter Completed Record address in Notes 7 Machine version For main...

Страница 40: ...Output power Input DC voltage Insulation limit K PV start up voltage Grid V Max V Min Frequency Max Min Reactive compensation PF Configuration MPPT Individual MPPT Parallel Monitoring RS485 Ethernet...

Страница 41: ...r to inverter site selection and installation 3 PHASE STRING INVERTERS CSIF ST 016 A 0 INSTALLER S NAME INSTALLER S SIGNATURE COMPANY DATE Inverter serial numbers 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1...

Отзывы: