7. Normal operation
7. Normal operation
7.5.11.2 Backflow Power
->Set Backflow Power
Figure 7.
Set the
p
o
wer
24
backflow
Figure 7.25
Press the UP/DOWN keys to set data.Press the ENTER key to set backflow power.
Then press DOWN keys to move the cursor, press UP to change the number.
Press the ESC key to save the settings and return to the previous menu.
The setting is used to define the allowed export power into the grid.
The setting range is between 00000W to 29900W.
YES=<ENT> NO=<ESC>
Power:-00000W
Select EPM Settings from the Main Menu to access the following options:
1. Mode Select 2.
Backflow Power 3.
Fail safe ON/OFF 4.
Backflow Work Mode
7.5.11.1 Mode Select
There are 4 settings in this menu as below:
1. OFF 2. Meter in Load 3. Meter in Grid 4.Consumption Monitor
OFF:
Functions are disabled
Meter in Load:
Canadian Solar Smart Meter is connected in the load branch circuit.
Meter in Grid:
Canadian Solar Smart Meter is connected in the grid connection point
(The backflow power is default as 0W).
Consumption Monitor:
Canadian Solar Smart Meter is connected in the grid connection
point (The backflow power setting is not applicable).
7.5.11.3 Fail safe ON/OFF
This setting is used to give out an alarm (stop inverter generation as well) when the Meter
connection is lost during operation.
It can prevent potential backflow power into the grid when the system loses control.
Figure 7.26 Set the
Fail
Safe ON/OFF
YES=<ENT> NO=<ESC>
Fail
Safe Set:ON
It is only mandatory to turn on this function when the inverter is installed in UK due to the G100
regulation. For other regions,customers can enable or disable the function as they desire.
NOTE:
When the failsafe function is ON and CT/Meter is disconnected somehow,
the inverter will stop generation and give "Failsafe" alarm on the LCD.
When the failsafe function is OFF and CT/Meter is disconnected somehow,
the inverter will keep the output power as the last moment when the
CT/Meter is still connected. After a restart, the inverter will output at full
power without limit.
Please refer to below instructions for different user scenarios.
Scenario 1. Only Function 1 is required
Step 1: Refer to Section 4.3 to connect the smart meter on the grid side or load side.
Step 2: Select the Section 7.5.11.1 Mode Select as Option 2(Meter in Load) or
Option 3 (Meter in Grid) accordingly.
Step 3: Configure the Section 7.5.11.2 to set the allowed backflow power.
Step 4: Configure the Section 7.5.11.3 to enable the failsafe function (If necessary).
Step 5: Configure the Section 7.5.11.4 to modify the work mode (If necessary).
Scenario 2. Both Function 1 and 2 are required
Using a Smart Meter:
Step 1: Refer to Section 4.3 to connect the smart meter on the grid side.
Step 2: Select the Section 7.5.11.1 Mode Select as Option 3(Meter in Grid).
Step 3: Select the Section 7.5.2.2 24H Switch as "Enable".
Step 4: Configure the Section 7.5.11.2 to set the allowed backflow power.
Step 5: Configure the Section 7.5.11.3 to enable the failsafe function (If necessary).
Step 6: Configure the Canadian Solar monitoring system
(Please refer to the manual of monitoring device).
If customer does not want to enable the export power control function, please change
the "backflow power" to the max output power of the inverter in Step 4 OR simply
select the mode as "consumption monitor" in Step 2 and skip Step 4-5.
Содержание CSI-50K-T400GL03-E
Страница 34: ...70 71 11 Declarations 11 1 REACH Declaration 11 Declarations...
Страница 35: ...72 11 Declarations 11 Declarations 73 11 2 CE and RoHS Declaration...
Страница 36: ...11 Declarations 74...