A)  Strip the end of AC cable outer insulating jacket about 90mm then strip the end of each 

wire about 15mm. (as shown in figure 5.17)

Figure 5.17 Strip AC cable

The steps to assemble the AC grid terminals are listed as follows:

Additional explanation:

If the diameter of the protective jacket of the AC cable is less than recommended

(

20K models: 17-25mm; 30K models: 21-30mm) spiral wound tape should be 

used to increase the cable diameter to the recommended size.

The

 

adhesive

 

tape

 

is

 

provided

 

in

 

the

 

accessories.

Figure

 

5

.

18

 

Winding tape in spiral pattern

AC

 

cable

tape

clearance<1.0mm

Please winding after 
the clearance of first 
layer with the 
adhesive tape. 

layer

For all AC connections, 10- 35mm   105 

 cable is required to be used. 

2

Please make sure the resistance of cable is lower than 1.5 ohm. If the wire is longer than 

100m, it's recommended to use 16-35mm  cable. Refer to local electrical codes for wire sizing.

2

5.3.3 AC side connection

The length after winding

AC cable diameter

30K model

AC cable diameter

20K model

Winding the first 

    layer

Winding the second

    layer(if needed)

Please tie the end with 

    a ribbon or rope

This picture is for reference only. Actual cable may differ, use it as the standard.

    

B)  Remove the 4 screws on the AC terminal cover and remove the cover. Remove

the screw under the terminal slide and pull out the terminal. (as shown in figure 5.19)

    

C)  Insert the cable through cup nut, water proof sleeve and AC terminal cover into the AC

terminal and use a 4mm Hex wrench to tighten the screws. The torque is 3Nm.( as

 

shown in 

figure 5.20)

Figure 5.19 Disassemble AC terminal cover

If the wire is over 10mm  , the L1 and PE can be 5mm longer than the L2, L3, and N. In this 

2

way the L1 and PE can be easier connected to the

 

termina

l

 connector.

5.

 

Installation

5.

 

Installation

.20.

.21.

Содержание CSI-20KTL-GI-FL

Страница 1: ...om Australia Canadian Solar MSS Australia Pty Ltd Technical Department 42 44 Stephenson Street Richmond VIC 3121 Australia Tel 61 3 8609 1844 E mail service au canadiansolar com Rest of Asia Pacific C...

Страница 2: ...on accordingly Canadian Solar accepts no liability for customers failure to comply with the instructions for correct installation and will not be held responsible for upstream or downstream systems Ca...

Страница 3: ...afety Symbols 2 2 General Safety Instruction 4 1 2 Packaging List 3 1 1 Product Description 5 Installation 5 1 Select a Location for the Inverter 5 2 Mounting the Inverter 5 3 Electrical Connections 6...

Страница 4: ...uage Setting 7 3 4 Screen Brightness Control 30 31 7 3 5 System Update 32 7 4 7 Yearly Energy Detail 7 4 8 Total Energy Detail 7 4 9 Work Log 36 37 37 7 4 6 Monthly Energy Detail 36 7 5 5 Calibrate En...

Страница 5: ...ld result in serious injury or death Improper use may result in potential electric shock hazards or burns This manual contains important instructions that should be followed during installation and ma...

Страница 6: ...CPD CSI 20KTL GI FL should be 40A CSI 25KTL GI FL CSI 30KTL GI FL CSI 33KTL GI FL and CSI 40KTL GI HFL should be 63A CAUTION Risk of electric shock Do not remove cover Refer maintenance servicing to q...

Страница 7: ...data 2 Service messages for operator 3 Alarm messages and fault indications POWER OPERATION ALARM Access to modify the adjustable settings the ESC and the ENTER keys 3 Overview Table 3 1 Status indic...

Страница 8: ...the Inverter Figure 5 1 Recommended installation position 4 Installation 4 2 Product storage Use the original box to repackage the inverter seal with adhesive tape with the desiccant inside the box 5...

Страница 9: ...vertical position The steps of mounting are as follows Figure 5 3 The dimensions of the mounting bracket in mm 3 Using the expansion bolts to fix the bracket to the wall Install on a vertical surface...

Страница 10: ...1 All electrical installations must be in accordance with all local and national standards Table 5 1 Electrical connection symbols GRID COM1 Connecting terminal of the Grid DC 1 DC4 _ Positive DC inp...

Страница 11: ...T cable terminal crimping area 2mm 3mm Figure5 7 suitable length Figure5 8 strip wire In order to improve the corrosion resistance of the grounding terminal we recommend that the external grounding te...

Страница 12: ...sure the polarity of the output voltage of PV array matches the DC and DC symbols 5 3 2 DC side connection The steps of assembling the DC connectors are listed as follows ii Insert the wire into the c...

Страница 13: ...the wire is longer than 100m it s recommended to use 16 35mm cable Refer to local electrical codes for wire sizing 2 5 3 3 AC side connection The length after winding AC cable diameter 30K model AC c...

Страница 14: ...structions of Canadian Solar communication products Figure 5 20 Connect cable to AC terminal Figure 5 21 Tighten the AC terminal RS485 communication connection of RJ45 network port 1 Insert the networ...

Страница 15: ...ply Main Switch AC OFF 2 Wait 30 seconds Switch the DC switch OFF or directly disconnect the DC output connector The LEDs and LCD of the inverter will be off within one minute 6 1 Start the inverter 1...

Страница 16: ...h Status NO Grid 2015 02 23 19 35 MENU ENT MONTHLY ENERGY ESC ESC UP DOWN ENT 0 003 006 009 0012 0 15 0 18 0 21 0 0 00 00 10 20 30 40 50 60 P o w e r k W 7 General Operation There are four submenu in...

Страница 17: ...uency Carbon Offset Ef ciency Generating 0003687kWh 0000014kWh 0000001kWh 0508kWh 2081kWh 0071 6kWh 000204kWh 50 01Hz 0003 67ton 99 99 ESC UP DOWN ENT 7 General Operation 7 General Operation 7 3 Setti...

Страница 18: ...the previous menu Set Address 2015 02 23 19 35 YES ENT NO ESC Slave Address 01 ESC UP DOWN ENT Press the ESC key to cancel the change and return to the previous menu 7 General Operation 7 General Ope...

Страница 19: ...y by pressing the UP DOWN keys Pressing the ENTER key gives access to a submenu 7 4 1 Alarm Message The display shows the 10 latest alarm messages see Figure 7 14 Screens can be scrolled manually by p...

Страница 20: ...he inverter see Figure 7 17 which is for service technicians only Figure 7 17 Communication data 7 4 5 Daily Energy Information The screen shows the daily energy detail of the inverter see Figure 7 18...

Страница 21: ...ress the UP DOWN keys to select energy power detail of different date Yearly Energy 2015 02 23 19 35 2015 0 0 0 5 1 0 1 5 2 0 2 5 3 0 Ye a r l y E n e r g y M W h 01 02 03 04 05 06 07 08 09 10 11 12 0...

Страница 22: ...oid the warranty The default password is 0010 Figure 7 23 Advanced settings Advanced Set 2015 02 23 19 35 Select Standard Grid ON OFF Power Control Clear Energy Restore Settings Calibrate Reset Passwo...

Страница 23: ...e inverter see Figure 7 27 Press the DOWN key to move the cursor Press the UP key to revise the value Press the ENTER key to execute the setting Press the ESC key to return to the previous menu Figure...

Страница 24: ...om working properly This function is applicable by maintenance personnel only wrong operation will prevent the inverter from reaching maximum power Press the DOWN key to move the cursor Press the UP k...

Страница 25: ...hooting 44 45 Alarms Cause Solution Input voltage low missing Polarity reversed Main board damaged No Information Blank Screen Test DC switch OFF Check PV connections Check polarity Check voltage 120V...

Страница 26: ...cts low DCV on internal bus Test Measure DC and AC voltages Compare with LCD Replace Inverter Internal damage Wire came loose during shipping 9 Troubleshooting 9 Troubleshooting 46 47 Alarms Cause Sol...

Страница 27: ...ent Amps Number of MPPT Nominal grid voltage Volts Rated output current Output power factor range Grid current THD Nominal grid frequency Hertz Operating frequency range Hertz Peak efficiency CEC weig...

Страница 28: ...Max apparent output power VA 33000 CSI 30KTL GI FL 34000 MC mateable and OT Terminal connect 72A 18 A per MPPT 47 52 or 57 62 Max voltage Volts Startup voltage Volts Operating MPPT voltage range Volt...

Страница 29: ...put power VA 33000 CSI 33KTL GI FL 36000 MC mateable and OT Terminal connect 72A 18 A per MPPT 10 Specification 200 800 47 52 or 57 62 Max voltage Volts Startup voltage Volts Operating MPPT voltage ra...

Страница 30: ...000 Voltage V Figure 10 4 CSI 33KTL Gl FL Inverter output power by input voltage 10 Specification 54 10 Specification 55 P V curve for CSI 20KTL Gl FL Power W 20000 7000 200 278 800 990 1000 Voltage V...

Страница 31: ...by ambient temperature 100 50 0 45 60 T P 25 P V curve for CSI 40KTL Gl HFL Power W 40000 14000 200 556 800 990 1000 Voltage V Figure 10 5 CSI 40KTL Gl HFL Inverter output power by input voltage 10 Sp...

Страница 32: ...er to the mounting bracket and ensure it is irmly attached Ensure the inverter has proper clearances and are properly ventilated Completed 5 Serial number Record the product serial numbers located on...

Страница 33: ...checking Initially GridV Outlimit and GridF Outlimit will be displayed then the inverter will switch to Standby mode 2 Switch on the AC switch The Grid faults will clear automatically In Standby mode...

Страница 34: ...ys the information of GENERATING Completed Record LEDs status in Notes 4 Power generation After grid connection record power output of inverter Completed Record power in Notes 5 Date Time setting Set...

Страница 35: ...ariances Inverter model Inverter irmware revision DSP LCD Number of inverters Inverter mounting tilt Output power Input DC voltage Insulation limit K PV start up voltage Grid V Max V Min Frequency Max...

Страница 36: ...This checklist is not a replacement for the user manual Please read the user manual prior to inverter site selection and installation 3 PHASE STRING INVERTERS KTL SERIES CSIF ST 016 A 0 INSTALLER S N...

Отзывы: