7.1.2.2 RFM18 base installation
Position the RFM18 on the surface where it will be installed. Make sure the hinge direction is
correct and mark the locations of the four mounting holes. Refer to
FIGURE 1-3
(p. 1) for possible
tilt directions.
(p. 20) shows the RFM18 dimensions and hole spacing. Install an
anchor (user-supplied) sufficient to support the tower for each hole.
FIGURE 7-11. RFM18 base dimensions
Attach the bottom section of the tower to the RFM18 base by using one 9/16 inch bolt per leg
(
(p. 21)). Position the base over the anchor holes. Secure the base to the anchors by
using appropriate hardware (user supplied). Check the tower for plumb and shim the RFM18, if
necessary, before fully tightening the bolts.
UT20 and UT30 Universal Towers
20
Содержание UT20
Страница 1: ...Revision 03 2020 Copyright 1993 2020 Campbell Scientific Inc...
Страница 10: ...FIGURE 5 1 UT20 tower UT20 and UT30 Universal Towers 7...
Страница 38: ...FIGURE 7 28 Bracket selection UT20 and UT30 Universal Towers 35...
Страница 41: ...A B 14 7 Page 1 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 42: ...C 43 2 cm 17 in A UTBASE Page 2 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 43: ...C B UTBASE Page 3 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...