NOTE:
When using the RFM18, the user-supplied mounting hardware must be capable of
withstanding the Maximum Wind Load given in
(p. 8). See Note 2 in that
section for a description of factors that affect wind load. In addition, the tower must make
use of guy wires to further increase the stability of the tower.
FIGURE 7-12. RFM18 flat roof mounting base
7.1.3 Guy anchor installation
There are two types of anchors for the tower guy wires: the UTEYE eye bolts are poured in
concrete; the UTDUK duckbill anchors are driven into the soil.
7.1.3.1 UTEYE eyebolt guy anchor
1. Dig a hole 24 inches square by 24 inches deep at each anchor location (
2. Optional — Construct a concrete form out of 2-inch x 4-inch lumber, 24 inches square
(inside dimensions) for each hole. Center the forms over the holes and level them by using
a carpenter’s level and stakes.
3. Fill the holes with concrete and install the eyebolts as shown in
UT20 and UT30 Universal Towers
21
Содержание UT20
Страница 1: ...Revision 03 2020 Copyright 1993 2020 Campbell Scientific Inc...
Страница 10: ...FIGURE 5 1 UT20 tower UT20 and UT30 Universal Towers 7...
Страница 38: ...FIGURE 7 28 Bracket selection UT20 and UT30 Universal Towers 35...
Страница 41: ...A B 14 7 Page 1 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 42: ...C 43 2 cm 17 in A UTBASE Page 2 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...
Страница 43: ...C B UTBASE Page 3 of 3 A A B B C C 1 2 3 0 1 2 3 3 inch reference...