T107 Weather Station
2.4.7 Pyranometer
Level the pyranometer as indicated in FIGURE 2-19. Adjust the three leveling
screws until the bubble level indicates plumb.
Remove the red or green
shipping cap from the pyranometer.
See FIGURE 2-20.
FIGURE 2-19. Pyranometer Leveling
FIGURE 2-20. Remove Red or Green Pyranometer Cap
Remove Cap
Leveling
Screws
27
Содержание T107
Страница 2: ......
Страница 3: ......
Страница 49: ...T107 Weather Station FIGURE 2 31 Slide Antenna Bracket U Bolt around Back of the Pole 41...
Страница 75: ...T107 Weather Station FIGURE 4 7 Schematic of TE525 ET Rain Sensor and Connector Rain Precip Rain Precip 67...
Страница 78: ...T107 Weather Station 70...
Страница 82: ...Appendix B PS24 24 Ahr Power Supply and 10 x 12 inch Enclosure FIGURE B 2 24 Ahr Battery and Battery Cable B 2...
Страница 83: ...Appendix B PS24 24 Ahr Power Supply and 10 x 12 inch Enclosure FIGURE B 3 Enclosure Supply Kit B 3...
Страница 93: ...Appendix C Exploded Views C 1 Enclosure C 1...
Страница 94: ...Appendix C Exploded Views C 2 Crossarm C 2...
Страница 102: ...Appendix D Default Programs D 8...
Страница 105: ......