ET107 Weather Station
26
4.
Put the gold funnel back on the top of the rain gage after leveling has been
completed.
5.
Plug the cable in the
RAIN/PRECIP
connector on the enclosure. Ensure
that the plug is completely seated on the connector and the locking ring is
turned a quarter revolution clockwise.
5.5.7 Pyranometer
1.
Adjust the three leveling screws until the bubble level indicates plumb
).
FIGURE 5-20. Pyranometer leveling
2.
Remove the red or green shipping cap from the pyranometer (FIGURE
).
FIGURE 5-21. Remove red or green pyranometer cap
Remove
Cap
Leveling
Screws