Table of Contents
ii
Cleaning Windows and Domes ................................................... 23
Replacing the Drying Cartridge .................................................. 23
Appendices
B. CNR4 Performance and Measurements under
Different Conditions ............................................ B-1
C. CNF4 Heater/Ventilator .......................................... C-1
General Information ......................................................................... C-1
Attaching the Optional CNF4 Heater/Ventilator Unit to CNR4 ...... C-3
Data Logger Programming for Heater/Ventilator Control ............... C-8
CNF4 Heater/Ventilator Maintenance .............................................. C-9
Testing the Heater ..................................................................... C-9
Testing the Ventilator ................................................................ C-9
Replacing the Filter for the Ventilator ...................................... C-9
Figures
6-1. The CNR4 net radiometer with cables and mounting rod, top
6-2. The CNR4 net radiometer with CNF 4 heater/ventilator unit, top
7-1. Attaching the mounting rod to the CNR4 body .................................. 10
7-2. Attaching the CNR4 onto the mounting rod using vertical pole or
horizontal crossarm ......................................................................... 10
7-3. The CNR4 sensor with SOLAR and TEMP cables ............................ 12
7-4. The marks on the end of the CNR4: S for SOLAR cable, and T
for TEMP cable............................................................................... 12
7-5. Labels on the pigtail end of the SOLAR cable ................................... 13
7-6. Labels on the pigtail end of the TEMP cable. ....................................
9-1. Replacing the drying cartridge ........................................................... 23
B-1. Different measurement conditions and signals ................................. B-2
B-2. Partly cloudy day for the upward facing pyrgeometer ..................... B-2
B-3. Clear day for the downward facing pyrgeometer ............................. B-3
C-1. CNF4 package contents .................................................................... C-3
C-2. Attaching the CNF4 to CNR4 using pan-head screws and
C-3. Making sure the cables are clear from the edges .............................. C-5
C-4. CNF4 solar shield and four flat-head screws ................................... C-5
C-5. Attaching the solar shield to CNF4 using four flat-head screws ...... C-6
C-6. Affixing the sensor label to CNF4 ................................................... C-6
C-7. Connecting the CNF4 power control cable and the mounting rod ... C-6
Tables
Connection) .................................................................................... 13