Section 1. Preparation and Siting
1.1 Installation Tasks
1.1.1 Indoors
•
Immediately upon receipt of your shipment…
⇒
Open shipping cartons.
⇒
Check contents against invoice. Contact CSI immediately about any
shortages.
•
Several days prior to the planned installation date…
⇒
Collect tools and site information (Section 1)
⇒
Assemble datalogger, communications device, and power supply in
enclosure (Section 3)
⇒
Install datalogger support software on PC (Section 5)
⇒
Establish communications between the datalogger and the PC
(Section 5)
⇒
Program datalogger, test sensors, and retrieve data (Section 5)
⇒
Trial run the tripod installation, assembling as much as possible
(Section 2)
⇒
Repackage equipment for transport to the field site
1.1.2 Outdoors
•
Locate suitable site (Section 1)
•
Prepare tower or tripod base (Section 2)
•
Raise tripod (Section 2)
•
Install instrumentation enclosure (Section 3)
•
Install sensors (Section 4)
1-1
Содержание CM10
Страница 12: ...Section 1 Preparation and Siting 1 6...
Страница 35: ...Section 3 Instrumentation Installation Datalogger Computer FIGURE 3 3 4 SRM 5A Wiring 3 11...
Страница 45: ...Section 4 Sensor Installation 107 Mounting Clamp FIGURE 4 5 1 107 Temperature Probe 4 5...
Страница 47: ...Section 4 Sensor Installation HMP50 Mounting Clamp FIGURE 4 7 1 HMP50 Temperature and RH Probe 4 7...
Страница 60: ...Section 4 Sensor Installation 4 20...
Страница 62: ...Section 5 Standard Software Installation 5 2...
Страница 67: ......