
PM 1001608 000 06
Device handbook LINAX PQ3000-PQ5000
27/90
6. Commissioning
Before commissioning you have to check if the connection data of the device match the data
of the plant (see nameplate).
If so, you can start to put the device into operation by switching on the power supply and the
measurement inputs.
Measurement input
Input voltage
Input current
System frequency
1 Works no.
2 Test and conformity marks
3 Assignment voltage inputs
4 Assignment current inputs
5 Assignment power supply
6 Load capacity relay outputs
…………………………………………………………………………………………………………………………
Measurement input
Input voltage
Input current
System frequency
1 Works no.
2 Test and conformity marks
3 Assignment voltage inputs
4 Assignment current inputs
5 Assignment power supply
6 Load capacity relay outputs