background image

Pa

g.

 

7

  - 

Ma

n

u

al

 c

od

e: 

3

1

9

U

1

6

319

U

16

 ve

r.

 

0

.

0.

5

  0

9

/2

0

0

7

  © C

A

M

E c

an

celli auto

mati

ci

 s.p

.a. - 

Th

e d

ata an

d i

nf

or

m

ati

on r

ep

orte

d i

n thi

s i

n

stall

ati

on

 manu

al ar

e s

u

sc

ep

tib

le to c

h

ang

e at an

y time an

d with

ou

t o

b

lig

ati

on

 o

n C

A

M

E cancelli auto

mat

ici s.p

.a. to n

ot

ify u

ser

s.

ENGLISH

  %  

 0 

  #8 #9 43

Signal Flasher 

(socket rating: 24V - 25W max.) 

Flashes during opening and closing phases

Open gate indicator-light 

(socket rating: 24V - 3W max.).
Turns on when the gate is ajar or open. 
It turns off when the gate is closed.

(Also see Chapt. 6.4)

6.5 - SIGNALLING AND LIGHTING DEVICES

6.4 - ELECTRICAL LOCK

After hooking it up as shown in the illustration, 
proceed as follows: 

a

) - Set 

dip switch 6 to ON

 (and dip switch 

3 to OFF);;

b

) - 

press CH1:

 the red PROG led will start to 

blink;

c

) - when the 

led stays on 

(after about 5 

seconds) the procedure is complete;

d

) - set to the 

dip switches back to OFF

 (or 

to the previous position, which depends on the 
functions selection, see paragraph 7, page 10).

N.B.: to return to default (indicator lamp on 10-5), 
follow the same procedure while pressing CH2.

ZL90 allows you to connect, 

alternatively to the indicator light on 10-5

, a 12V (15W max) electrolock, and if necessary also the “Ram 

Blow” function. 

a

)

To activate the “ram blow” 

(1)

:

a

a

) - Set 

) - Set 

dip switches 3 and 6 to ON

dip switches 3 and 6 to ON

;;

b

b

), 

), 

c

c

), 

), 

d

d

) - continue with the above 

) - continue with the above 

COMMON PROCEDUR

COMMON PROCEDURE

.

N.B.: to exclude the ram blow, follow the same procedure while pressing CH2.

(1)  

Upon each opening command, the gate leaves press on the closing jamb for one second, 

assisting the electrolock release operation.     

  %    0    #8 #9 43

5

place 

a 3.15 A 

fuse in between

17V 
transformer 
terminal  

a

)

b

)

COMMON PROCEDURE

d

)

c

Содержание Z 24 Series

Страница 1: ...Z 24 SERIES INSTALLATION MANUAL ZL90 CONTROL PANEL FOR 24V OPERATORS English EN...

Страница 2: ...II Material ABS Protection rating IP54 operating temperature 20 55 C This product is engineered and manufactured by CAME cancelli automatici s p a and complies with current safety regulations Guarante...

Страница 3: ...2 M1 motor fuse 3 M2 motor fuse 4 Line fuse 5 Accessories fuse 6 Control unit fuse 8 Buttons for calibrating the stroke 8 Buttons for memorising the radio code 9 Control and signalling LED unit 10 Fun...

Страница 4: ...with extra insulation as compared to the other conductive parts inside Make sure you have suitable tubing and conduits for the electrical cables to pass through and be protected against mechanical dam...

Страница 5: ...rom the connected devices and according to the CEI EN 60204 1 standards For connections that require several sequential loads the sizes given on the table must be re evaluated based on actual power dr...

Страница 6: ...GLISH Power supply 230V a c 50 60 Hz Terminals for powering the following accessories 24V a c normally alternated power 24V a c continuous power when the emergency batte ries are in operation Overall...

Страница 7: ...c when the led stays on after about 5 seconds the procedure is complete d set to the dip switches back to OFF or to the previous position which depends on the functions selection see paragraph 7 page...

Страница 8: ...causes reversal until total opening is obtained partial stop N C socket input for safety devices such as photocells sensitive edges and other EN 12978 compliant devices Halts mo ving gate leaves and...

Страница 9: ...ivate test operation IMPORTANT when running the safety test function the N C contacts if unused should be excluded on the relative DIP switches see chapter 7 selecting functions 6 8 ELECTRICAL CONNECT...

Страница 10: ...p function with button 2 7 and remote control with built in radiofrequency card 2 OFF open close inversion function with button 2 7 and remote control with built in radiofrequency card 3 ON Open only...

Страница 11: ...ocells that are set to the PARTIAL STOP or OBSTACLE STAND BY function Led CY Led PROG Led ALIM Led STOP Led CX TH 9 Signal LED Trimmer ACT Adjusts the waiting time when gate is open Once this time has...

Страница 12: ...to be half way open block the gearmotors again 10 1 PRELIMINARY ASSESSMENT OF THE DIRECTION OF MOVEMENT DURING OPENING Otherwise 1 if the gate leaves close invert the M N phases on either of the gear...

Страница 13: ...TIC CALIBRATION OF THE GEARMOTORS The gate leaf of the second gearmotor perform a closing run and an opening run With gate leaves fully ope the PROG LED stays on for some seconds to show the proper au...

Страница 14: ...a to notify users ENGLISH 11 Activating the remote control AF card Lock the radiofrequency card into the electronic card AFTER CUTTING OFF THE POWER SUPPLY or after disconnecting the batte ries N B t...

Страница 15: ...i s p a to notify users ENGLISH 11 3 TRANSMITTERS CAME CAME CAME CAME CAME CAME CAME CAME CAME CAME TOUCH TCH 4024 TCH 4048 TOP TOP 432NA TOP 434NA TOP 432S TOP TOP 302A TOP 304A TOP TOP 432A TOP 434A...

Страница 16: ...onic card pressed The LED ashes 2 Press the transmitter button you wish to memorise The LED will stay on to show memorisation has been successful LED flashing LED on 11 4 MEMORISATION CH1 Channel for...

Страница 17: ...98 37 EC CAME Cancelli Automatici S p A via Martiri della Libert 15 31030 Dosson di Casier Treviso ITALY tel 39 0422 4940 fax 39 0422 4941 internet www came it e mail info came it Declares under its o...

Страница 18: ...1 237 Warszawa Warszawa POLAND 48 22 8365076 48 22 8363296 CAME United Kingdom Ltd CAME United Kingdom Ltd Unit 3 Orchard Business Park Town Street Sandiacre Nottingham Nottingham Ng10 5du UNITED KING...

Отзывы: