(
(
(
H - 100 mm
H
10 ÷ 20 mm
V201
?
20 ÷ 30 mm
max 330 mm
M6x80
M6
Pa
g
e
66
- M
a
n
u
a
l c
o
d
e:
11
9
E
V
8
8
E
N
11
9
E
V
8
8
E
N
ve
r.
6
6
0
5
/2
0
1
4 © C
A
M
E
c
a
n
c
e
lli a
u
to
m
a
ti
ci
S
.p.
A
. - T
h
e d
a
ta
a
n
d i
n
fo
rm
a
ti
o
n p
ro
vi
d
e
d
i
n
t
h
is
m
a
n
u
a
l a
re s
u
b
je
c
t t
o
c
h
a
n
g
e
a
t a
n
y t
im
e
w
it
h
o
u
t p
ri
o
r n
o
ti
c
e
b
y C
A
M
E
C
a
n
c
e
lli A
u
to
m
a
ti
ci
S
.p.
A
.
Examples of use
* sectional door
with single rail
* sectional door
with double rail
CANOPY OVERHEAD DOORS
, with partially retracting movement.
SPRING-BALANCED OVERHEAD DOOR,
, with fully retracting movement
SECTIONAL DOOR
Securing the slide rail
Secure the slide rail to the centre of the door compartment using suitable screws.
Lift up the guide and place it horizontally to measure the distance from the ceiling and choose the type of fastening.
INSTALLATION
⚠
The following illustrations are only example as the space for securing the gearmotor and accessories varies in relation to dimensions. The installation technician is
responsible for choosing the most suitable solution.
Position the slide rail as follows:
for sectional doors above the post-spring bracket.
for overhead doors between 10 and 20 mm from the highest point of the leaf sliding curve.
for canopy overhead doors with partially retracting movement, use the V201 arm (see the accompanying technical documentation).
Assembling the transmission rail.
Secure the bracket to the transmission rail
using the
screw and nut supplied
.