Pa
g.
1
3
13
-
Ma
n
u
al
c
od
e:
11
9
G
3
0
5
5
11
9
G
3
0
5
5
ve
r.
1
.0
1.
0
1
0
/2
0
0
9
© C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. -
Th
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. to n
otify u
se
rs.
ENGLISH
Lay the corrugated tubes to make the connections coming from the junction pit.
N.B. the number of tubes depends on the type of installation and accessories being fi tted.
Warning: to install this at least two or three people are needed. Use hoisting equipment to move and position the turnstile
When securing, the turnstile may be unstable and could tip over, so be careful not to lean onto it until securing in complete.
UNI1751 Ø10 washer
UNI5587 M8 Nut
6.4 Installing the turnstile
Secure the supporting columns to the traverse.
Cable junction pit
Intelligent Security & Fire Ltd.