26
MENU DESCRIPTIONS
MAIN MENU
SUB MENU
DESCRIPTION
ENCODER (continued...)
The Encoder menu appears only if selected from the "Config." function in the FUNCTIONS menu. Before setting the functions in
the encoder menu run the gearmotor checks to verify the proper turning direction.
M2 Appr.CH%
M2 % Ajar closing point:
Sets the ajar closing point percentage of the second M2 motor. The point the gate leaf enters its ajar
closing phase is computed as a percentage (from 1% to 15% of the full gate run).
M2 Appr.AP%
M2 Acc. Opening:
Sets the point at which the gate begins adjusting deceleration before making contact with the opening endpoint of
the second motor (M2). The beginning point of adjustment is calculated as a percentage ( between 1% and 15%) of the total gate run
time.
Set Encoder
Gate run calibration:
Calibrates the gate
ʼ
s opening and closing runs and decelerations.
TIMING ADJ.
Time setting menu
ACT
Automatic closing:
To set the waiting time when gate is in the open position. Once this time is elapsed, the gate closes automatically.
The waiting time can be set to between 0” and 300”.
Partial ACT
Automatic Partial Closing:
Waiting time of the (M2) second gate when in the open position. Once this time interval has elapsed, the
gate automatically closes. The waiting time interval can go anywhere from 0” to 300”.
Cycle Time
Cycle Time:
The working time of the motor during opening or closing phases is anywhere from 10” to 150”.
Op. Delay M1
M1 Delayed Opening:
The waiting time of the (M1) first gate lead, unlike the (M2) second one, after each opening command. The
waiting time can be set to between 0” and 10”.
CI. Delay M2
M2 Delayed Closing:
The waiting time of the (M2) second gate leaf, unlike the (M1) first one, after each closing command.
The waiting time can be set to between 0” and 60”.
Preflashing T.
Pre-flashing Time:
After an opening or closing command is given, the flasher connected to
(
10-E), flashes for between 1” and 60”,
before the gate begins to move.
Lock Time
Lock Time:
The time required for releasing the electro-lock after each opening command. The time of operation can be set to between 1”
and 5”.
Ram hit time
Ram blow time:
The gearmotor
ʼ
s thrust time when fully closing and opening after each command .The thrust time can be set to between
1” and 3”.
Slow down time
Partial Opening:
Opening time of the second (M2) gate leaf. The time can set between 5 and 60 seconds.
USERS
The USERS menu is used to program remote controls.
Add User
Add User:
To create a new user and assigned function (max. 250 users).
Mod. name
Mod. Name:
To change a user number or existing name to another name.
Mod. code
Mod Code:
To change a user
ʼ
s current code.
Related Func
Related Function:
To change the function assigned to the user.
Remove Usr.
Remove User:
To remove an existing user. Confirm the use you wish to remove with the ENTER button.
Delete all Usr
Delete all users:
To cancel all registered users. Con
fi
rm cancellation of all users with ENTER button.
Backup data
Backup data:
To save the users in the memory roll. Con
fi
rm saving of users on the memory roll with ENTER button.
Restore backup
Restore backup:
To load the data saved on the memory roll onto card (if the card is of the same version it loads both users and
settings, otherwise it only loads the users).
INFO
Info Menu
Version
Version:
To view software version.
Number of gate runs:
To view the number of runs performed by the operator.
Starting Mssg:
To view the starting message, confirm with ENTER to change text. Use the ENTER button to move the cursor forward,
ESC to move it backwards and <> to select the letter of number. Confirm the text by pressing the ENTER key for a few seconds.
System reset:
Resets the system to the original factory settings. Press ENTER key to confirm.
TEST MOT.
Motor Test Menu
TEST MOT.
MOT TEST.:
The MOT test checks that gearmotors are rotating in the proper direction.
M1: Gate leaf opening run of the first (M1) gearmotor. If the direction is wrong, invert the motor
ʼ
s phases.
M2: Gate leaf opening run of the second (M2) gearmotor. If the direction is wrong, invert the motor
ʼ
s phases.
PROGRAMMING
Содержание FERNI
Страница 2: ......
Страница 35: ......
Страница 36: ...01 36719C 2012 The Chamberlain Group Inc All Rights Reserved 845 Larch Avenue Elmhurst Illinois 60126 1196 ...
Страница 38: ......
Страница 71: ......
Страница 72: ...01 36719C 2012 The Chamberlain Group Inc Tous droits réservés 845 Larch Avenue Elmhurst Illinois 60126 1196 ...