-
U
V
W
-
E
+
U
V
W
E
+
-
U
V
W
-
E
+
U
V
W
E
+
Pa
g.
1
0
10
- M
an
u
al
c
od
e:
11
9
D
U
6
4
11
9
D
U
6
4
ve
r.
3
3
0
5
/2
0
13 © C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. - T
h
e d
ata a
n
d i
nf
or
m
ati
on r
ep
orte
d i
n th
is
in
sta
lla
tio
n m
an
u
al
a
re s
u
sc
ep
tib
le to c
h
an
g
e at a
ny ti
m
e a
n
d w
ith
ou
t o
b
lig
ati
on
o
n C
A
M
E c
an
ce
lli
auto
m
ati
ci
s.p.a. to n
otify u
se
rs.
ENGLISH
LEFT-HAND installed
gearmotor
RIGHT-HAND installed
gearmotor
5.10.1 Electrical connections to the ZM3E (F7001E)
5.10
Electrical connections
Upper microswitch
Securing screws for the upper
cam
Switch
Upper cam
OPENING STOP
After adjusting the closing endpoint you may adjust the opening microswitch.
Always with the gearmotor released ...
1) Manually push the gate to the desired open position (max. 110°).
2) turn the UPPER CAM COUNTER-CLOCKWISE until the switch is activated.
3) tighten the two screws.
230V AC gearmotor connection for delayed
OPENING function
230V AC gearmotor connection for
delayed CLOSING function
230V AC gearmotor connection for delayed
CLOSING function
230V AC gearmotor connection for
delayed OPENING function
LEFT-HAND installed
gearmotor
RIGHT-HAND installed
gearmotor
Grounding
Содержание F7001
Страница 3: ......
Страница 19: ...F7001 F7001E English EN 119DU64EN AUTOMATION FOR SWING GATES INSTALLATION MANUAL ...
Страница 21: ......
Страница 37: ...F7001 F7001E Français FR 119DU64FR AUTOMATISME POUR PORTAILS BATTANTS MANUEL D INSTALLATION ...
Страница 39: ......
Страница 55: ...F7001 F7001E 119DU64RU Русский RU АВТОМАТИКА ДЛЯ РАСПАШНЫХ ВОРОТ ИНСТРУКЦИЯ ПО МОНТАЖУ ...
Страница 57: ......