p.
9
- Manual
FA01337-EN
- 11/2019 - © C
AME S.p.A. - The cont
ents of this manual may be changed at any time and without notice. - T
ranslation of the original instructions
Establishing the bracket fastening points
Install with the gate open.
Manually open the gate leaf to 90° or 120°.
First determine where the gate bracket needs to be positioned, then where the post bracket needs to be positioned.
Respect the values indicated in the table.
A
C
B
≥60
60
E
F
5
ATS30AGS
ATS30AGR
Gate-leaf opening (°)
A
B
E
F
Max. C
90°
130
130
910
1170
50
90°
150
220
910
1290
150
90°
120
270
890
1300
200
120°
180
130
910
1300
50
ATS50AGS
ATS50AGR
Gate-leaf opening (°)
A
B
E
F
Max. C
90°
200
200
1030
1430
150
90°
200
270
1030
1510
200
120°
200
140
1030
1460
70