background image

Chapter 2: Packaging and Installation of Access Point 

41 

 

Mounting  XV2-21X

 

The XV2-21X units are mounted by using one of the following mounting techniques: 

 

Ceiling mount, 

 

 

Wall mounting, or 

 

 

T-bar mounting. 

 

Ceiling mount

 

 

 

To mount the XV2-21X unit by using the ceiling mount technique, perform the following steps: 

1.

 

Determine a place or location where you want to mount the XV2-21X unit. 

2.

 

Remove the ceiling tile. 

3.

 

Using the hole template, mark the hole locations. 

4.

 

Drill the holes for the four mounting screws using a 5mm 

(3/6”)

 diameter drill bit. 

5.

 

Drill the RJ45 cable hole using a 15 mm 

(5/8”)

 diameter bit. 

Содержание XE5-8

Страница 1: ...HARDWARE INSTALLATION GUIDE Enterprise Wi Fi 6 Access Point System Release 6 5...

Страница 2: ...s or the 3rd Party software supplied material contained in the Cambium products described in this document may not be copied reproduced reverse engineered distributed merged or modified in any manner...

Страница 3: ...X 8 cnMaestro On Premises 8 Reporting problems 8 Security advice 8 Safety and regulatory information 9 Human exposure to radio frequency energy 10 USA and Canada specific information 11 Federal Commun...

Страница 4: ...iance margins 18 Chapter 2 Packaging and Installation of Access Point 20 Unpacking the Access Point 20 Package contents 20 Mounting the device 20 Mounting XV3 8 22 Mounting XE5 8 25 Mounting XV2 2 27...

Страница 5: ...mbium Networks products This User Guide describes various features supported by Cambium Network s Access Point AP It also provides detailed instructions for setting up and configuring the AP Intended...

Страница 6: ...hardware platforms introduced in Enterprise Wi Fi 6 Access Points Table 2 New hardware platforms Hardware Platform Description Supported Software Version XV2 21X 2x2 2 2x2 2 802 11a b g n ac wave 2 a...

Страница 7: ...6 4 1 and above Acess Point AP management options Table 4 AP management options Management Option Description Standalone AP can be managed directly from its GUI by selecting the Configure tab on the m...

Страница 8: ...rks com Reporting problems If any problems are encountered when installing or operating this equipment follow this procedure to investigate and report 1 Search this document and the software release n...

Страница 9: ...ing at heights Grounding and protective earth Cambium Networks Enterprise Access Point AP devices must be properly grounded to protect against lightning It is the responsibility of the user to install...

Страница 10: ...levant standards USA and EC applicable when working with RF equipment are ANSI IEEE C95 1 1991 IEEE Standard for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields...

Страница 11: ...d by turning the equipment off and on the user is encouraged to try to correct the interference by one of the following measures Reorient or relocate the receiving antenna Increase the separation betw...

Страница 12: ...n the equipment and receiver Connect the equipment into an outlet on a circuit different from that which the receiver is connected Consult the dealer or an experienced radio TV technician for help The...

Страница 13: ...important when installing and configuring an Enterprise Wi Fi 6 AP system for operation in the 5 GHz band 5150 5250 MHz FCC only 5250 5350 MHz 5470 5725 MHz 5725 5850 MHz and 5925 6425 MHz Avoidance...

Страница 14: ...or tower mount guidelines If you need to install AP to a metal tower or pole then in addition to the general protection requirements follow the below requirements Ensure that the position of the equip...

Страница 15: ...on the wall of a building then in addition to the general protection requirements follow the below requirements also Ensure that the position of the equipment is lower than the top of the building or...

Страница 16: ...Grounding and lightning protection on wall Training The installer needs to have basic competence in radio and IP network installation The specific requirements applicable to the Cambium Networks Ente...

Страница 17: ...e power density exposure limit is 0 6455 f 0 5 where f is the lowest frequency of the supported band Calculation of power density and distance The following calculation is based on the ANSI IEEE C95 1...

Страница 18: ...nation for the USA and Canada These are conservative distances that include compliance margins Cambium Networks Enterprise Wi Fi 6 AP adheres to all applicable EIRP limits for transmit power when oper...

Страница 19: ...0 26 0 433 27 CE 0 1957 1 98 2 4G 5G W m 20 XV2 2T1 FCC 0 466 0 461 2 4G 5G 26 IC 0 328 0 324 2 4G 5G 31 CE 0 193 1 97 2 4G 5G W m 20 XE3 4 FCC 0 24 0 35 0 02196 2 4G 5G 6G 30 IC 0 20 0 29 2 4G 5G 33...

Страница 20: ...for damage If any item is damaged or missing notify your authorized Cambium Networks Enterprise Wi Fi 6 AP sales representative Package contents A complete Cambium Networks Enterprise Wi Fi 6 AP packa...

Страница 21: ...unt General wall mount Table 6 provides an overview of the type of mountings each Enterprise Wi Fi 6 APs supports Table 7 Types of mounting the device Access Point Wall Mount Ceiling Mount T bar Mount...

Страница 22: ...remove the ceiling tile 2 Using the hole template mark the hole locations 3 Drill the holes for the four mounting screws using a 5 mm 3 6 diameter drill bit 4 Drill a hole for the RJ45 cable using a...

Страница 23: ...g two screws with corresponding wall anchors The ceiling mount bracket can be used as a template to align the screws with the unit T bar Mounting The XV3 8 can be secured to a 38mm ceiling T bar rail...

Страница 24: ...ar rail using the clips built into the underside of the unit The B marking on the bracket must be used for this width T bar rail 14mm T Bar The XV3 8 unit can be mounted to a 14mm width T bar rail usi...

Страница 25: ...or the four mounting screws using a 5 mm 3 6 diameter drill bit 4 Drill a hole for the RJ45 cable using a 15 mm 5 8 diameter bit 5 Hold the mounting plate on the top side of the ceiling tile and screw...

Страница 26: ...T bar rail by using the ceiling mount bracket The A marking on the bracket must be used for this width T bar rail 38mm T Bar 24mm T Bar The XE5 8 unit can be mounted to a 24mm width T bar rail using t...

Страница 27: ...it can be mounted to a 14mm width T bar rail using the clips built into the underside of theunit The C marking on the bracket must be used for this width T bar rail Mounting XV2 2 The XV2 2 units are...

Страница 28: ...5 cable hole using a 15 mm 5 8 diameter bit 5 Hold the mounting plate on the top side of the ceiling tile and screw it on the mounting bracket 6 Run the RJ45 cable s through the 15mm hole and remount...

Страница 29: ...ng T bar rail by using the ceiling mount bracket The A marking on the bracket must be used for this width T bar rail 38mm T Bar 24mm T Bar The XV2 2 unit can be mounted to a 24mm width T bar rail usin...

Страница 30: ...d Installation of Access Point 30 14mm T Bar The XV2 2 unit can be mounted to a 14mm width T bar rail using the clips built into the underside of theunit The C marking on the bracket must be used for...

Страница 31: ...XV2 2T XV2 2T1 unit on the wall perform the following steps 1 Drill two holes of each 6 mm 0 25 Inch on the wall where you want to mount the XV2 2T XV2 2T1 AP 2 Press fit the plastic anchor and assemb...

Страница 32: ...Chapter 2 Packaging and Installation of Access Point 32 6 Hang the XV2 2T unit to the wall mount bracket and tighten the four screws as shown in below figure...

Страница 33: ...e XV2 2T XV2 2T1 unit on the pole perform the following steps 1 Insert the hose mounting clamp though the pole mounting level bracket 2 Fix the clamp to the pole by applying 9 0 Nm torque 3 Fasten fou...

Страница 34: ...f Access Point 34 5 Slide it downwards Pole mount with tilt bracket Only for XV2 2T1 To mount the XV2 2T1 unit on the pole perform the following steps 1 Assemble the pole mount holder to XV2 2T1 by us...

Страница 35: ...Point 35 2 Install the pole mount bracket to the pole by using two hose clamps with the 9Nm torque 3 Assemble XV2 2T1 with pole mount holder to pole mount bracket Use M12 stud washer and M12 nut to s...

Страница 36: ...Chapter 2 Packaging and Installation of Access Point 36...

Страница 37: ...Wall mounting or T bar mounting Ceiling mount To mount the XE3 4 unit by using the ceiling mount technique perform the following steps 1 Determine a place or location where you want to mount the XE3 4...

Страница 38: ...he ceiling tile 8 Attach the RJ45 cable s to XE3 4 unit 9 Slide XE3 4 unit into the mounting bracket Wall mounting You can mount XE3 4 to any wall by using two screws with corresponding wall anchors T...

Страница 39: ...d Installation of Access Point 39 24mm T Bar The XE3 4 unit can be mounted to a 24mm width T bar rail using the clips built into the underside of the unit The B marking on the bracket must be used for...

Страница 40: ...d Installation of Access Point 40 14mm T Bar The XE3 4 unit can be mounted to a 14mm width T bar rail using the clips built into the underside of theunit The C marking on the bracket must be used for...

Страница 41: ...g Ceiling mount To mount the XV2 21X unit by using the ceiling mount technique perform the following steps 1 Determine a place or location where you want to mount the XV2 21X unit 2 Remove the ceiling...

Страница 42: ...ble s to XV2 21X unit 9 Slide the XV2 21X unit into the mounting bracket Wall mounting You can mount XV2 21X to any wall by using two screws with corresponding wall anchors The ceiling mount bracket c...

Страница 43: ...r rail using the clips built into the underside of the unit The B marking on the bracket must be used for this width T bar rail 14mm T Bar The XV2 21X unit can be mounted to a 14mm width T bar rail us...

Страница 44: ...Chapter 2 Packaging and Installation of Access Point 44...

Страница 45: ...23T units are mounted by using one of the following mounting techniques Pole mount or Wall mounting Pole mount 1 Insert hose clamps through pole mounting bracket and clamp to pole by applying 6 0 Nm...

Страница 46: ...adio housing with 1 5 Nm to 2 Nm torque Wall mounting 1 Drill 4 holes of 6mm 0 25 Inch on wall 2 Press fit plastic anchor and assembly fastener 3 Leave 5mm to 6mm gap between wall and fastener head 4...

Страница 47: ...Chapter 2 Packaging and Installation of Access Point 47...

Страница 48: ...at least 2 screws 2 Connect the Ethernet cable to the upper RJ 45 port labeled Eth1 PoE at the rear side of XV2 22H to provide connectivity Use the other RJ 45 port labeled Pass Through for any additi...

Страница 49: ...he short Ethernet jumper cable between the two RJ 45 connections on the rear side of XV2 22H 3 Mount XV2 22H into the generic wall bracket by aligning the hooks 4 Secure XV2 22H to the bracket using T...

Страница 50: ...connectivity solutions in urban suburban and rural environments with wireless that just works Support website https support cambiumnetworks com Support enquiries Technical training https learning cam...

Страница 51: ...frequenza 2401 2483 MHz EN 300 328 100 mW 20 dBm Disponibile per uso generale in tutte i Paesi dell UE L intera serie XV XV2 Series 5150 5350 MHz EN 301 893 200 mW 23 dBm L intera serie XV XV2 Series...

Страница 52: ...etworks WEEE Cambium Networks 2 4 5 XV2 XV2 24 XV2 XV2 UL L P S Limited Power Source 42 57 0 25 Gigabit Passive PoE 802 3 af at PSE Install Guide Declaraci n de conformidad simplificada de la UE Por e...

Отзывы: