Chapter 1: About This User Guide
15
Figure 1:
Grounding and lightning protection on pole or tower
Wall mount guidelines
If you need to install AP on the wall of a building, then in addition to the general protection requirements,
follow the below requirements also:
⚫
Ensure that the position of the equipment is lower than the top of the building or its lightning air
terminal.
⚫
Ensure that the building is correctly grounded.
Connection examples of wall installations are shown in below figure.