Quick steps for deployment
19
establishment to take place. See TD-90 Pre-Config instructions for more details.
Figure 5 :
Step 5- From – To connection diagram
Step 6 - Power Up
Once power is applied at each PoE injector, both the radio and the TD-90 will boot up. An orange LED will
indicate link activity between the TD-90 and the radio followed by a solid green LED to indicate the TD-90
controller is up. Once the green LED comes up the TD-90 should start enter the pre-configured mode 1, 2,
or 3.
Содержание TD-90 Series
Страница 1: ...USER GUIDE TD 90 Series ...
Страница 4: ...4 TD 90 Errors 53 System Recovery 61 Contacting Cambium Networks 62 ...
Страница 15: ...TD 90 Pre Configuration 15 Figure 10 Step 10 Optional Mode 1 Setup ...
Страница 26: ...TD 90 Mechanical and Electrical Interfaces 26 Right Side View of TD 90 ...
Страница 35: ...Web Based User Interface 35 ...
Страница 39: ...Web Based User Interface 39 ...
Страница 41: ...Web Based User Interface 41 ...
Страница 46: ...Web Based User Interface 46 ...
Страница 48: ...Web Based User Interface 48 ...
Страница 52: ...Web Based User Interface 52 ...
Страница 54: ...Web Based User Interface 54 ...