12
-
Ed.
1/2012 Rev.0
ENG
SECTION 2
INSTALLING THE MACHINE
2.1 Unpacking
Normally unpacking involves:
Step
Action
1
Remove the fastening strap from the cardboard box
and the wooden bedplate (pallet) by using a suitable
tool (pair of scissors, cutter, etc).
2
Introduce the point of a screwdriver between the
cardboard and the points that fasten the lower part
of the packaging and remove them by pulling
outwards.
3
Remove the upper cover of the cardboard
packaging.
4
Take away the anti-static PVC bag and the expanded polystyrene.
5
Unscrew the “L” elements around the machine.
6
Open the packaging completely and introduce the ropes and the lifting belts
under the bedplate, towards both ends (make sure the capacity of the ropes
are adequate for the weight of the machine).
Adjust the ropes or the belts so that all the lifting points are wrapped
around and there is no chance that they slip off and the weight loses
its balance.
7
Carefully sling the machine by protecting the parts of the structure that make
direct contact with the lifting ropes/belts.
8
Lift the machine from the wooden bedplate (pallet) and unload it in the
allotted site on the ground.