background image

Before re3commissioning the unitg all scale and

moisture must be removed from the level sensor

insulating gaskets to avoid false signalling

through the scale to the boiler body4 Failure to

remove this scale and dry the probes could cause

the sensor to indicate to the Printed Circuit Board

hPCBv that water is covering the element whether

or not water is present4 In this situation the PCB

could energise the element g causing failure4 If

in doubt g protect the element by hand filling the

boiler with water to cover the element before

switching on the electrical supply4

ISSUE 3

PAGE 5

MXN Replacing the jlement or Thermistor

The element or thermistor can be replaced by

removing the back-nuts and washers and withdrawing

from inside the boiling chamber.

IMPORTANT 9

A

new body lid gasket may be required4

MXS Replacing the Main fiircuit board LPfiK1 and

Triac PfiKX

ThemainPCBandthetriacPCBshouldbereplaced

as a matched pair to be sure of correcting circuit

board faults4

WX

Disconnect the wiring connections to the main

PCB

BX

Remove the PCB by pulling it forward off the

supports

NX

Disconnect the wiring to the triac PCB and remove

by releasing the fixing screw and pulling it forward off

the supports.

SX

Apply a thin layer of heat transfer compound

(supplied) to the mounting platform of the replacement

triac PCB and fit to the mounting supports. Ensure it

is positively located

and secure it with the single

fixing screw4

OX

Reconnect the triac wiring , see wiring diagram at

the rear of the manual

MX

Position the main PCB on the four supports and

wire in accordance with wiring diagram

MXO Replacing the Inlet Solenoid Valve

IMPORTANT9 In areas where scale can be a

problemg check that the fault is not due to a

blocked filter

( this is removable at the inlet to

the solenoid)

before replacing the unit4 Scale

build up in the filter can cause intermittent

problems4

WX

Remove the silicone hose that joins the sole-

noid to the water inlet.

Warningg the pipe will

retain a volume of water that will be released

when the connection is broken4

F4

Pull the solenoid from the mounting brack-

et

IMPORTANT9 the correct operation of

the boiler relies on a regulated flow of

water from the solenoid valve and there3

fore a genuine replacement part supplied

by Calomax must be fitted4

-4

Fit the replacement part onto the exist-

ing mounting bracket (if a mounting bracket

was supplied with the replacement valve this

should be removed ) and re-connect the live

and neutral connections

MXM Replacing the zispense ValveF Key

Switch F Push KuttonF Fascia PfiK

To replace any of the above parts, the

following instructions should be followed:-

1. Remove the outer casing lid

2. Loosen the two screws in the cover plate

located above the fascia and slide the plate

out.

3. Remove the four screws from the back

panel and remove , being careful not to

damage the thermal cut-out in the process

4. Remove each of the two screws holding

the copper heat sink, solenoid bracket and

main PCB bracket in position and allow them

to hang loose.

5. Remove the earth wire adjacent to the

main PCB from the right hand side of the

outer casing.

6. Unplug the wiring harness from the fascia

PCB and move the harness away from the

top of the outer casing.

7. Remove 2 screws from either side of the

base of the boiler.

8. The outer casing can now be removed by

leaning it forward, clear of the dispense valve,

and lifting it up / forward from the base.

Note 9 when re3assembling the boiler ensure the

wiring harness is plugged back into the fascia

PCB and the harness does not become trapped

between the body and outer casing4

zispense Valve

1. Disconnect the wires from the coil

2. Remove the two setscrews

3. Pull the valve forward leaving the rubber

insert behind.

Содержание Quantum

Страница 1: ...Manuals and Documents Brought to you by Wechillit com Ltd WCI Group House 18 Pride Hill Shrewsbury SY1 1DQ Tel 01743 289418 Fax 01743 289416 Web www wechillit com...

Страница 2: ...oughly before commencing installation or undertaking maintenance workX Issue N A zfiR MGSPUxMxpO TjLP pWWN BSH MMUW F XP pWWN BNO pNOU wwwXcalomaxXcoXuk fiounterAtop fiatering Water Koiler INSTALLATIO...

Страница 3: ...l Requirements X X X X X X X B BXN Installation Location X X X X X X X B BXS Vent Overflow Pipe Requirements X X X X X B MX M INTjN Nfij X X X X X X X X X S MXW Draining Down The Boiler X X X X X X X...

Страница 4: ...SLPK kit comprising 3 off level sensors QDVK valve including silicone sealing grommet FIH Water Research Council approved hose QPCBT main pcb includes triac pcb CASSV solenoid valve NBPRG pressure rel...

Страница 5: ...l 3 kW element at 240v 50Hz supply A circuit diagram is provided at the back of the manual BXN Installation Location Ensure the counter top is of suitable construction to support the working weight of...

Страница 6: ...will illuminate only when the boiler is at operating temperature and also full capacity is available for dispense If all water is drawn from the unit the flow will reduce to a trickle The unit will r...

Страница 7: ...removedg it is recommended that a new body lid gasket is fitted on assembly to ensure a steam tight seal4 Damage to the unit caused by incorrectly sealed gaskets that should have been replaced during...

Страница 8: ...the inlet to the solenoid before replacing the unit4 Scale build up in the filter can cause intermittent problems4 WX Remove the silicone hose that joins the sole noid to the water inlet Warningg the...

Страница 9: ...cates the solenoid should be energised The solenoid dispense valve and element are permanently live fed and each are switched via the neutral connection Water boils at different temperatures depending...

Страница 10: ...N FRONT PANEL THERMAL CUTOUT EARTH ON BODY EARTH ON BASE PINK PINK ORANGE BROWN OPT1 U1 OP1 EARTH ON CASING Wiring Schematic for Calomax Quantum Water Boiler using v11 board RED YELLOW BLACK BLUE PINK...

Отзывы: