background image

CONTENTS

NX

INST,LL,TION

X

X

X

X

X

X

X

X

X

N

SX

fiOMMISSIONING X

X

X

X

X

X

X

X

X

N

OX

USjR INSTRUfiTIONS

X

X

X

X

X

X

X

X

N

OXW

Cleaning

X

X

X

X

X

X

X

X

X

S

OXB

Service Indicator Light

X

X

X

X

X

X

X

S

GX

F,ULT FINzING

X

X

X

X

X

X

X

X

X

M

UX

WIRING SfiHjM,TIfi

X

X

X

X

X

X

X

X

G

WX

P,RTS IzjNTIFIfi,TION X

X

X

X

X

X

X

P,Gj W

BX

PL,NNING THj INST,LL,TION X

X

X

X

X

X

X

B

BXW

Water Requirements

X

X

X

X

X

X

X

B

BXB

Electrical Requirements

X

X

X

X

X

X

X

B

BXN

Installation Location

X

X

X

X

X

X

X

B

BXS

Vent/Overflow Pipe Requirements

X

X

X

X

X

B

MX

M,INTjN,Nfij

X

X

X

X

X

X

X

X

X

S

MXW

Draining Down The Boiler

X

X

X

X

X

X

X

S

MXB

Scale

X

X

X

X

X

X

X

X

X

X

S

MXBXW

Checking the Extent of Scale Formation

X

X

X

X

X

S

MXBXB

De-Scaling

X

X

X

X

X

X

X

X

X

S

MXN

Replacing the Element or Thermistor

X

X

X

X

X

O

MXS

Replacing the Main Printed Circuit Board and Triac PCB

X X

X

X

O

MXO

Replacing the Inlet Solenoid Valve

X

X

X

X

X

X

O

MXM

Replacing the Dispense Valve, Key Switch, Push Button, Fascia PCB .

O

MXG

Adjusting the Water Temperature Set Point .

.

.

.

X

M

Содержание Quantum

Страница 1: ...Manuals and Documents Brought to you by Wechillit com Ltd WCI Group House 18 Pride Hill Shrewsbury SY1 1DQ Tel 01743 289418 Fax 01743 289416 Web www wechillit com...

Страница 2: ...oughly before commencing installation or undertaking maintenance workX Issue N A zfiR MGSPUxMxpO TjLP pWWN BSH MMUW F XP pWWN BNO pNOU wwwXcalomaxXcoXuk fiounterAtop fiatering Water Koiler INSTALLATIO...

Страница 3: ...l Requirements X X X X X X X B BXN Installation Location X X X X X X X B BXS Vent Overflow Pipe Requirements X X X X X B MX M INTjN Nfij X X X X X X X X X S MXW Draining Down The Boiler X X X X X X X...

Страница 4: ...SLPK kit comprising 3 off level sensors QDVK valve including silicone sealing grommet FIH Water Research Council approved hose QPCBT main pcb includes triac pcb CASSV solenoid valve NBPRG pressure rel...

Страница 5: ...l 3 kW element at 240v 50Hz supply A circuit diagram is provided at the back of the manual BXN Installation Location Ensure the counter top is of suitable construction to support the working weight of...

Страница 6: ...will illuminate only when the boiler is at operating temperature and also full capacity is available for dispense If all water is drawn from the unit the flow will reduce to a trickle The unit will r...

Страница 7: ...removedg it is recommended that a new body lid gasket is fitted on assembly to ensure a steam tight seal4 Damage to the unit caused by incorrectly sealed gaskets that should have been replaced during...

Страница 8: ...the inlet to the solenoid before replacing the unit4 Scale build up in the filter can cause intermittent problems4 WX Remove the silicone hose that joins the sole noid to the water inlet Warningg the...

Страница 9: ...cates the solenoid should be energised The solenoid dispense valve and element are permanently live fed and each are switched via the neutral connection Water boils at different temperatures depending...

Страница 10: ...N FRONT PANEL THERMAL CUTOUT EARTH ON BODY EARTH ON BASE PINK PINK ORANGE BROWN OPT1 U1 OP1 EARTH ON CASING Wiring Schematic for Calomax Quantum Water Boiler using v11 board RED YELLOW BLACK BLUE PINK...

Отзывы: