Page 6
ELECTRICAL CONNECTIONS
The boiler is supplied with a fitted plug and lead and should be plugged
into a 240v 13A electrical socket, capable of carrying a load of 3kW. The
installation of a residual current device (RCD) having a rated residual
operating current not exceeding 30 mA is advisable
.
USER INSTRUCTIONS
During normal operation some external parts will become
hot. Care must be taken to avoid injury, a burn or scald.
Commissioning
1.
Turn water supply on
2. Turn electrical supply on
On initial switch-on only
After a few seconds delay for the electronics to charge up, the boiler will
begin filling with water and the ‘Ready’ light will flash to indicate wait. If the
key switch is in the ‘on’ position the push button will flash to indicate wait,
at this point the button is disabled. When water reaches the low level sensor
(element covered) the element will be energised as well as the solenoid.
When the selected operating level is reached the solenoid will turn off and
the element will remain on until full operating temperature is reached.
With the key switch in the ‘ON’ position the push button will stop flashing
and show solid colour when the boiler is up to full temperature and the
button will be enabled, at this point the ‘ Ready’ light will stop flashing and
show solid colour and the ‘Full’ light will also be illuminated.
VENT & OVERFLOW
The vent / overflow pipe must be extended and laid with a
continuous
fall
,
discharging to a safe and visible point. The pipe should not be directly
connected to a closed waste, as taste problems may occur and should
never be allowed to become blocked or restricted. One way this could
be connected is via a tundish arrangement. 15mm copper or ‘Speedfit’
pipe should be used. If the machine is operated without the overfill pipe
being extended as advised, any subsequent damage incurred will be the
responsibility of the installer.
Содержание QUANTUM-e
Страница 20: ...Page 20 MAINTENANCE AND SERVICE HISTORY ...
Страница 21: ...Page 21 MAINTENANCE AND SERVICE HISTORY ...
Страница 22: ...Page 22 MAINTENANCE AND SERVICE HISTORY ...