background image

Page 7

The element(s) may be also be energized at the same time. If water is 

drawn from the machine but boiling water is still available, the Wait/Ready 

light will be illuminated solid yellow. If full draw off capacity is removed the 

boiler may cool, indicated by the Wait/Ready light flashing yellow.

Note:

When the green service indicator light on the front of the boiler is showing 

solid colour, the header tank sensor has been starved of water for in 

excess of 30 seconds and the bottom thermistor has been disabled. To 

reinstate normal operation the water supply needs to be re-applied.

If the service indicator light flashes, this indicates that the water level has 

reached the high level sensor and the likelihood is that the normal level 

sensor requires de-scaling, or the machine has over-filled due to debris 

trapped in the solenoid valve.The debris can be removed by drawing plenty 

of water from the dispense tap, causing the solenoid valve to operate and 

flush out the obstruction. The machine will reset itself once the problem has 

cleared. If this does not rectify the problem, turn off the water supply and 

remove the flexible hose to check for debris in the valve’s filter. When the 

service light is flashing, the element is disabled and the boiler may cool. 

For further assistance, contact our service department on 0113 249 6681,  

or e-mail [email protected].

The production of scale is a natural phenomenon and commonly occurs 

in hot water systems. The nature of the scale produced and its rate of 

formation varies widely throughout the country.

To ensure continuous, reliable operation, the boiler should be regularly de-

scaled by a suitably qualified engineer. Suitable chemical de-scalants must 

only be used if the manufacturers recommendations are strictly adhered 

to. This is to prevent health and safety issues, taste problems and potential 

damage to the appliance. Misuse of such chemicals is not covered by the 

product warranty.

The Kudos range of boilers benefit from an integral scale inhibitor. 

This 

is not

 a scale eliminator and its effects will differ according to the 

water 

quality in your area. To ensure trouble free operation, periodically check 

for scale inside the boiling chamber. The production of scale is a natural 

phenomenon and some de-scaling may be required within the first 12 

months. This is not covered under the products warranty as it is not a fault. 

SCALE

Содержание KUDOS 6 DUAL FLOW

Страница 1: ...ND SERVICING INSTRUCTIONS Calomax Limited Lupton Avenue Leeds LS9 7DD Tel 0113 249 6681 Fax 0113 235 0358 e mail service calomax co uk www calomax co uk Please read these instructions carefully before...

Страница 2: ...AND WEIGHTS 5 VENT OVERFLOW 5 ELECTRICAL CONNECTIONS 6 USER INSTRUCTIONS 6 SCALE 7 GENERAL OPERATION 8 GENERAL NOTES 8 CLEANING 8 ACCESSORIES 9 10 11 SERVICE INSTRUCTIONS 12 EXPLODED DIAGRAMS 15 16 S...

Страница 3: ...n check that the following parts have been supplied with the boiler 1 WRAS approved flexible water inlet hose suitable for potable water 2 Status label This product conforms to the CE marking directiv...

Страница 4: ...d minimum ambient operating conditions must be between 5 C and 35 C The appliance is not suitable for installation where a water jet could be used Install the boiler on a surface suitable for near boi...

Страница 5: ...ected to a 15mm drinking water supply via an appropriate isolating valve The supply must provide a constant pressure of between 20 KPa and 1000 KPa 0 2 to 10 Bar If the water supply contains excessive...

Страница 6: ...ssioning Turn on the water supply and then switch on the electrical supply The Wait Ready light will flash yellow and the unit will pulse with water 8L Min When water reaches the normal operating leve...

Страница 7: ...e water supply and remove the flexible hose to check for debris in the valve s filter When the service light is flashing the element is disabled and the boiler may cool For further assistance contact...

Страница 8: ...ER THE TAP HAS BEEN CLOSED NEVER PASS YOUR HAND BENEATH THE NOZZLE Please retain these instructions for future reference Ensure that a suitable drip tray is positioned below the tap nozzle This will h...

Страница 9: ...ll mounting bracket for boiler Ref KWMBK Stainless Steel drip tray for Wall mounting bracket above Ref KWMBDTK free standing KWMBDTWDK with drain outlet SSDTWDK with drain outlet Boiler securing clamp...

Страница 10: ...e 10 Ingredient caddy Ref IC3 3 bay as shown Shelf unit For storing cups saucers etc Ref SHU Back panels To conceal water electrical connections REF K9BAC for Kudos6 Dual Flow Kudos9 Dual Flow IC4 4 b...

Страница 11: ...1 For more information visit our website at www calomax co uk or call 0113 249 6681 Water filter kit To reduce taste odour problems Ref CWFK Filter Cartridge Replacement filter for kit shown above Ref...

Страница 12: ...e water supply and remove the flexible hose to check for debris in the valve s filter When the service light is flashing the element is disabled and the boiler may cool For further assistance contact...

Страница 13: ...ll scale and moisture is removed from the level sensors and insulating gaskets to avoid a false signal being transmitted through the scale to the boiler body Failure to remove this scale and or moistu...

Страница 14: ...gainst the copper heat sinks to ensure reliable heat dissipation Heat transfer compound is also supplied with all replacement circuit boards Adjusting the Water Temperature Set Point The temperature p...

Страница 15: ...spare parts list 1 2 5 Fitted as standard Items 3 4 or 5 available as alternatives Houses item 23 Includes thermistor pocket all washers nuts 6 7 9 8 11 13 15 17 19 20 24 21 22 12 18 3 11 If parts req...

Страница 16: ...are parts list 1 2 5 Fitted as standard Items 3 4 or 5 available as alternatives Houses item 23 Includes thermistor pocket all washers nuts 6 7 9 8 11 14 15 17 19 20 24 21 22 12 18 3 11 If parts requi...

Страница 17: ...TAP BODY HEAT SHIELD SLOW FILL NOZZLE FAST FILL NOZZLE TAP TOP ASSEMBLY EXTENDED FAST FILL NOZZLE TAP CUP WASHER TAP SPRING TAP SLOTTED STEM 3kW ELEMENT THERMISTOR ASSEMBLY KIT SOLENOID VALVE PRINTED...

Страница 18: ...2 21 NBPRG KDFLPCBA KDFPMFK BODY LID GROMMET WATER LEVEL CONTROL PIPE WATER INLET HOSE PLASTIC FASCIA FOR DUAL FLOW BOILERS LIGHT PCB FOR DUAL FLOW BOILERS KTSK TANK SENSOR KIT NB15BLG KWTLG BODY LID...

Страница 19: ...NSOR LEVEL SENSING PIPE HEATER LED SOLENOID LED BOTTOM THERMISTOR THERMAL CUTOUT EARTH ON INTERNAL PANEL EARTH ON BODY TOP THERMISTOR NO CONNECTION BLUE BLUE BLUE RED BOTTOM ELEMENT TRIAC PCB RELAY NE...

Страница 20: ...BOTTOM THERMISTOR THERMAL CUTOUT EARTH ON INTERNAL PANEL EARTH ON BODY TOP THERMISTOR NO CONNECTION BLUE BLUE BLUE RED MIDDLE ELEMENT TRIAC PCB RELAY NEUTRAL BLOCK RCD INCOMING THREE PHASE SUPPLY THRO...

Страница 21: ...Scale page 12 Faulty wiring to thermistors faulty thermistors Temperature controller needs adjusting Element failed to earth Defective Printed Circuit Board De scale the boiler Particularly thermistor...

Страница 22: ...Page 22 NB Not to scale SERVICE HISTORY AND NOTES...

Страница 23: ...Some factors are beyond our control and would invalidate the warranty offered These include Incorrect installation High Low water pressure Incorrect voltage supply Accidental damage Limescale build u...

Страница 24: ...s Minute 6 Litres Minute 3 5 Litres Minute Voltage K6 DF K9 DF 220 240 V ac 50 60 Hz 1 PHASE 415 V ac 50 60 Hz 3 PHASE Power rating K6 DF K9 DF 6kW MAX 9kW MAX Note All measurements are approximate PL...

Отзывы: