![Calix E5-121/MNLC RT-410 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/calix/e5-121-mnlc-rt-410/e5-121-mnlc-rt-410_retrofit-installation-manual_3454397028.webp)
28
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
© 2001-2009 Calix. All Rights Reserved.
Turning Up the System
Turning up the system involves installing GMT fuses into the DC distribution panel to apply
power to the equipment. GMT fuses are supplied with the kit.
To turn up and test the DC power system
1.
At the DC distribution panel, install fuses as follows:
a.
Install a 5A GMT fuse in position 1. Verify that the first E5-121 unit powers up.
b.
Install additional 5A GMT fuses (into positions 2–4) to support additional E5-121
units, as required. Verify that each unit powers up.
c.
Install a 1A GMT fuse in position 12. Verify that the converter fan tray fans start
running.
2.
Using a volt meter, test the DC power supply voltage at the E5-121 shelf. Verify that the
voltage reads between -48 and -54 VDC.
3.
To equip the subscriber lines for service, install 5-pin fuse modules (as required) in
protection panel #4, located in the rear compartment.
Содержание E5-121/MNLC RT-410
Страница 1: ...Calix E5 121 MNLC RT 410 Retrofit Kit Installation Guide January 2009 220 00260 Rev 10 ...
Страница 2: ......