36
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
UPS Harness Wiring
Pin #
Color
Function
1 Brown 48
Vdc
2
Blue
48 Vdc Return
3 Black Signal
Return
4
Green
Operating in Battery Mode
5
Red
Replace Battery Indication
6
Yellow
Battery Missing (Not Connected)
7 Orange Low
Battery
Condition
Auxiliary UPS Connections
For ONT Model 560 deployments that utilize more than 8 POTS lines, an external battery
pack may be used in order to ensure life-line services remain on for a full 8 hours.
Note:
The External Battery Pack (EBP) comes with a 36 inch (91.4 cm) cable that attaches
to the primary UPS. Make sure you locate the EBP within this distance.
1.
Remove the battery cover by depressing the battery cover release tabs on the bottom
edge of the cover.
2.
Remove the battery temporarily.
3.
Place the EBP against the wall in the desired location, within 36 inches of the primary
UPS.
CAUTION!
Do not operate the UPS in conditions outside the specified
values for temperature and humidity. Refer to the Product Data Sheet for
details.
Make sure the UPS is not installed under water pipes which may leak or
drip from condensation.
4.
Using the keyholes as a template, drill holes for (2) two screws or other suitable
anchoring fasteners (not provided).
5.
Insert a screw into each hole, leaving 3/16 inch (48 mm) of the screw protruding from
the wall.
6.
Align the key slots on the bottom of the UPS with the screws and slide the unit down
into place.
7.
Tighten the screws once the UPS is in place.
© 2001-2007 Calix. All Rights Reserved.
Содержание 560 SBU ONT
Страница 1: ...Calix 560 SBU ONT Installation Guide November 2007 220 00215 Rev 11...
Страница 2: ......