34
Proprietary Information: Not for use or disclosure except by written agreement with Calix.
3.
Remove the battery temporarily.
4.
Place the UPS against the wall in the desired location.
CAUTION!
Do not operate the UPS in conditions outside the specified
values for temperature and humidity. Refer to the Product Data Sheet for
details.
Make sure the UPS is not installed under water pipes which may leak or
drip from condensation.
5.
Using the keyholes as a template, mark and drill holes for (2) screw or other suitable
anchoring fasteners (not provided).
6.
Insert a screw into each hole, leaving 3/16 inch (48 mm) of the screw protruding from
the wall.
7.
Align the key slots on the bottom of the UPS with the screws and slide the unit down
into place.
8.
Tighten the screws once the UPS is in place.
9.
Replace the battery and connect the battery terminals to the UPS connector.
10.
Install the AC power cord into the slot in the lower right hand corner of the power
supply. Do not plug the unit in at this time.
Important:
The battery begins charging when it is connected to AC power. Four hours
are required to fully charge the battery when first put into service. UPS back-up time will
be reduced until the battery is fully charged. Use only a rechargeable sealed lead acid
battery in this UPS.
11.
Locate the DC power cord previously threaded through the ONT grommet. Strip back
the jacket of the cord 2 inches (5 cm) and dress the wires for insertion into the terminal
block in the UPS.
12.
Strip the insulation off each wire and attach it to each terminal strip location as shown
below.