25

SYSTEM PUMP = Runs when any 
zone calls for heat. When priority is 
enabled, the status of the pump (on\
off) during a priority call is selected via 
a jumper
SEC PUMP = Runs when any zone 

calls for heat except the priority zone when it is enabled.
PRIORITY PUMP = Runs when the priority zone calls. A jumper is required 
between the END SWITCH terminals when using a pump for DHW.

6 Zone

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

L

PUMP 2

N

PRIMARY

PUMP

L

PRIORITY

PUMP 1

N

L

POWER IN

N

GROUNDS

L

PUMP 3

N

TRANSFORMER

L

N

T-STAT 4

C

R

W

T

T COM

L

PUMP 4

N

L

PUMP 5

N

L

PUMP 6

N

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

PWR

ZONE1

ZONE2

ZONE3

ZONE4

ZONE5

ZONE6

DipSwitches

Master

Slave

Priority OFF

Priority ON

Primary OFF

Primary ON

Exercise OFF

Exercise ON

Post Purge OFF

Post Purge ON

ZSR106

 

 

Boiler Connections

XX = Dry contacts rated up to 120 VAC, 2 Amps.  Closes when any zone calls 

including priority. Typically connected to TT on boiler control.

DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2 Amps.  Closes only 

when priority is enabled and calling. Typically used to close ZR\ZC (120 VAC) 

or DHW contacts (24 VAC) on boiler controls equipped with these features.

The ZVR series of controls is programmed
by positioning a series of jumpers. Example 
photo to right shows jumper in off position 
(left photo) and on position (right photo). 
Jumpers are used for the following 
operations. 

Priority ON / Priority OFF:

 When priority 

jumper is ON, upon demand, zone 1 will  
operate as priority and all other zones are 
temporarily switched off (with 1 hour time-
out). When priority mode is  OFF, any zones 
that were active when zone 1 was switched 
on will remain on.    

Status During Priority ON / Status During 

Priority OFF:

 When status jumper is ON, 

the system pump will continue to operate 
during priority.

Master / Slave: 

allows for unlimited expansion 

to additional ZVR relays.

6 Zone

ZVR106

L

POWER IN

N

PWR

TSAT1 ZONE1

TSAT2 ZONE2

TSAT3 ZONE3

TSAT4 ZONE4

TSAT5 ZONE5

TSAT6 ZONE6

L

PRIORITY

PUMP

N

L

SEC PUMP

N

STATUS
DURING

PRIORITY

ZONE 1

END

SWITCH

MOTOR

PRIORITY

ZONE 2

END

SWITCH

MOTOR

ZONE 3

END

SWITCH

MOTOR

ZONE 4

END

SWITCH

MOTOR

ZONE 5

END

SWITCH

MOTOR

ZONE 6

END

SWITCH

MOTOR

ON     OFF

ON     OFF

L

SYSTEM

PUMP

N

MASTER       SLAVE

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

T-STAT 4

C

R

W

T

T COM

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

6 Zone

ZVR106

L

POWER IN

N

PWR

TSAT1 ZONE1

TSAT2 ZONE2

TSAT3 ZONE3

TSAT4 ZONE4

TSAT5 ZONE5

TSAT6 ZONE6

L

PRIORITY

PUMP

N

L

SEC PUMP

N

STATUS
DURING

PRIORITY

ZONE 1

END

SWITCH

MOTOR

PRIORITY

ZONE 2

END

SWITCH

MOTOR

ZONE 3

END

SWITCH

MOTOR

ZONE 4

END

SWITCH

MOTOR

ZONE 5

END

SWITCH

MOTOR

ZONE 6

END

SWITCH

MOTOR

ON     OFF

ON     OFF

L

SYSTEM

PUMP

N

MASTER       SLAVE

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

T-STAT 4

C

R

W

T

T COM

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

6 Zone

ZVR106

L

POWER IN

N

PWR

TSAT1 ZONE1

TSAT2 ZONE2

TSAT3 ZONE3

TSAT4 ZONE4

TSAT5 ZONE5

TSAT6 ZONE6

L

PRIORITY

PUMP

N

L

SEC PUMP

N

STATUS
DURING

PRIORITY

ZONE 1

END

SWITCH

MOTOR

PRIORITY

ZONE 2

END

SWITCH

MOTOR

ZONE 3

END

SWITCH

MOTOR

ZONE 4

END

SWITCH

MOTOR

ZONE 5

END

SWITCH

MOTOR

ZONE 6

END

SWITCH

MOTOR

ON     OFF

ON     OFF

L

SYSTEM

PUMP

N

MASTER       SLAVE

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

T-STAT 4

C

R

W

T

T COM

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

Maintenance and Repair

: The  Caleffi Z-one™ multi-zone valve relay comes with 

a resettable fuse and requires no maintenance. If control fails or is damaged, 
replace control with functional one. 

R = 24 VAC.  
W = Heat call
C = Common of 24 VAC
Heat demand is initiated by closing R 
to W.
24 VAC is always present between R 
& C.  

Thermostat connections

6 Zone

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

L

PUMP 2

N

PRIMARY

PUMP

L

PRIORITY

PUMP 1

N

L

POWER IN

N

GROUNDS

L

PUMP 3

N

TRANSFORMER

L

N

T-STAT 4

C

R

W

T

T COM

L

PUMP 4

N

L

PUMP 5

N

L

PUMP 6

N

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

PWR

ZONE1

ZONE2

ZONE3

ZONE4

ZONE5

ZONE6

DipSwitches

Master

Slave

Priority OFF

Priority ON

Primary OFF

Primary ON

Exercise OFF

Exercise ON

Post Purge OFF

Post Purge ON

ZSR106

 

 

Connect terminals to matching terminal of 
slave boards
D to D, P to P, Ground to Ground
Use 18 gauge thermostat wire. Wire 
should be shielded if located in close proximity to high voltage wiring.

Communication connections

6 Zone

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

L

PUMP 2

N

PRIMARY

PUMP

L

PRIORITY

PUMP 1

N

L

POWER IN

N

GROUNDS

L

PUMP 3

N

TRANSFORMER

L

N

T-STAT 4

C

R

W

T

T COM

L

PUMP 4

N

L

PUMP 5

N

L

PUMP 6

N

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

PWR

ZONE1

ZONE2

ZONE3

ZONE4

ZONE5

ZONE6

DipSwitches

Master

Slave

Priority OFF

Priority ON

Primary OFF

Primary ON

Exercise OFF

Exercise ON

Post Purge OFF

Post Purge ON

ZSR106

 

 

L  = Line (hot leg) of 120 VAC supply
N = Neutral of 120 VAC
   = Ground

Input power

Pump outputs

6 Zone

ZVR106

L

POWER IN

N

PWR

TSAT1 ZONE1

TSAT2 ZONE2

TSAT3 ZONE3

TSAT4 ZONE4

TSAT5 ZONE5

TSAT6 ZONE6

L

PRIORITY

PUMP

N

L

SEC PUMP

N

STATUS
DURING

PRIORITY

ZONE 1

END

SWITCH

MOTOR

PRIORITY

ZONE 2

END

SWITCH

MOTOR

ZONE 3

END

SWITCH

MOTOR

ZONE 4

END

SWITCH

MOTOR

ZONE 5

END

SWITCH

MOTOR

ZONE 6

END

SWITCH

MOTOR

ON     OFF

ON     OFF

L

SYSTEM

PUMP

N

MASTER       SLAVE

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

T-STAT 4

C

R

W

T

T COM

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

6 Zone

ZVR106

L

POWER IN

N

PWR

TSAT1 ZONE1

TSAT2 ZONE2

TSAT3 ZONE3

TSAT4 ZONE4

TSAT5 ZONE5

TSAT6 ZONE6

L

PRIORITY

PUMP

N

L

SEC PUMP

N

STATUS
DURING

PRIORITY

ZONE 1

END

SWITCH

MOTOR

PRIORITY

ZONE 2

END

SWITCH

MOTOR

ZONE 3

END

SWITCH

MOTOR

ZONE 4

END

SWITCH

MOTOR

ZONE 5

END

SWITCH

MOTOR

ZONE 6

END

SWITCH

MOTOR

ON     OFF

ON     OFF

L

SYSTEM

PUMP

N

MASTER       SLAVE

T-STAT 2

C

R

W

T

T COM

COMMS

D

P

DHW

ZR/ZC

X X

T-STAT 3

C

R

W

T

T COM

T-STAT 1

C

R

W

T

T COM

T-STAT 4

C

R

W

T

T COM

T-STAT 5

C

R

W

T

T COM

T-STAT 6

C

R

W

T

T COM

Motor = 24 VAC to power the zone 
valve motor
End Switch = Connects to end switch 
on zone valve.  Must be jumpered if 
using a 2 –wire zone valve.  

Zone valve connections

WARNING: 

NEVER CONNECT R & C DIRECTLY, this will be a direct short on the 24 

VAC supply.

WARNING: 

When connecting 2 or more Z-one controls, all controls must be powered 

by the same 120 VAC circuit.

Содержание Z-one ZSR10 Series

Страница 1: ...ercise Dry contacts for DHW ZR ZC capable of switching line voltage High capacity transformer Large terminal connections Simplified wiring with extra ground terminals Heavy duty sealed relays Fuse pro...

Страница 2: ...nnections are in accordance with the electrical wiring diagram and in accordance with national and local electrical codes WARNING Avoid electrical noise interference Do not install near large conducto...

Страница 3: ...ON the primary pump will continue to operate during priority Exercise OFF Exercise ON When exercise mode is ON each circulator is switched on for 30 seconds following 72 hours of inactivity Post Purge...

Страница 4: ...duct with functional one Mounting Mount the Caleffi Z one switching relay box to a suitable surface Slotted holes are provided for mounting purposes Do not mount to a surface that exceeds 115 F 45 C T...

Страница 5: ...r removal Hold either the left or the right end of the box up and at an angle Use body for stabilizing relay box Insert screwdriver and push tabs inward cover should release from base Roll cover off b...

Страница 6: ...N L PUMP 5 N L PUMP 6 N THM 5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise O...

Страница 7: ...5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge...

Страница 8: ...6 Zone Z6P THM 2 C R W T T COM COMMS D P DHW ZR ZC X X THM 3 C R W T T COM THM 1 C R W T T COM L PUMP 2 N PRIMARY PUMP L PRIORITY PUMP 1 N L POWER IN N GROUNDS L PUMP 3 N TRANSFORMER 12 20VA L N THM...

Страница 9: ...along with a primary pump can be operated Zone priority is selectable with 1 hour time out feature Other features include pump exercising selectable post purge and 3 pump ground terminals for simpli...

Страница 10: ...20 ZVR103 ZVR104 ZVR106 multi zone valve control Product overview 22 Circuit board 23 Cover removal Transformer Installation 24 Product details 25 C1 Mod Con boiler hydro separator zone valves 26 C2 M...

Страница 11: ...UMP 5 N L PUMP 6 N THM 5 C R W T T COM THM 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Pos...

Страница 12: ...0 VAC pump with boiler enable or two devices without boiler enable 5 A capacity each relay 10 A total Rear knock outs for mounting onto 4 x4 junction box High capacity 6VA transformer Simpli ed wiring...

Страница 13: ...p connection Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats Replaceable fuses 6 VA Transformer Keyhole mounting which fits a 4X4 junction box Pre installed jumper Rear knockout f...

Страница 14: ...om power zone transformer N L L RELAY 1 C N O N C C N O N C RELAY 2 Calef single zone relay L N A1 Single thermostat Hydronic diagram is for illustration purposes only some components have been remove...

Страница 15: ...ied and opens RW TT The relay contacts return to their normal position common to normally closed The zone LED turns off Description of terminals Ground N Neutral Common leg of 120 VAC L Line live leg...

Страница 16: ...N C C N O N C RELAY 2 Calef single zone relay 4 wire zone valve 4 wire zone valve 4 wire zone valve R W 24 VAC T T R W R W End switch wires L N A2 Multiple thermostats Hydronic diagram is for illustr...

Страница 17: ...LED illuminates When the last of the T stats is satisfied the corresponding zone valves closes which opens the end switch contacts The relay contacts return to their normal position turning off power...

Страница 18: ...V R W C T T com power zone transformer N L L RELAY 1 C N O N C C N O N C RELAY 2 Calef single zone relay T T L N A3 Single master thermostat panel radiators with TRVs variable speed pump Hydronic diag...

Страница 19: ...side air reset curve As long as the master thermostat is calling the boiler will maintain the buffer tank to the target temperature The thermostatic radiator valves modulate the flow through the panel...

Страница 20: ...ure Selectable post purge and exercise Dry contacts for DHW ZR ZC capable of switching line voltage High capacity transformer Large terminal connections Simplified wiring with extra ground terminals H...

Страница 21: ...ions to expansion board Power ON LED Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats DHW ZR ZC closes only during priority call Rated for 120 VAC 2 amps Selectable DIP switches XX...

Страница 22: ...release from base Roll cover off base Mounting Do not mount to a surface that exceeds 115 F 45 C The unit must be only located in dry interior locations Use only copper conductor supply wire suitable...

Страница 23: ...M T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge ON ZSR106 Z...

Страница 24: ...P 6 N T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge...

Страница 25: ...ing priority Typically connected to TT on boiler control DHW ZR ZC Dry contacts rated up to 120 VAC 2 Amps Closes only when priority is enabled and calling Typically used to close ZR ZC 120 VAC or DHW...

Страница 26: ...R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF Post Purge ON DHW aquastat T T ZR...

Страница 27: ...ll of the zone pumps DHW Time Out Freeze Prevention Feature After one hour of a priority demand the control will open the DHW contacts and turn off power to the DHW pump If a heating demand is present...

Страница 28: ...N T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR ZONE1 ZONE2 ZONE3 ZONE4 ZONE5 ZONE6 DipSwitches Master Slave Priority OFF Priority ON Primary OFF Primary ON Exercise OFF Exercise ON Post Purge OFF...

Страница 29: ...C 2 Amps Closes when any zone calls including priority Typically connected to TT on boiler control DHW ZR ZC Dry contacts rated up to 120 VAC 2 Amps Closes only when priority is enabled and calling Ty...

Страница 30: ...contacts for DHW ZR ZC capable of switching line voltage Large terminal connections High capacity 40 VA transformer standard for 3 and 4 zone models expandable to 80 VA and 80 VA for the 6 zone model...

Страница 31: ...wire communications to expansion board Power ON LED Dual labeled T stat terminals Compatible with 2 3 and 4 wire T stats DHW ZR ZC closes only during priority call Rated for 120 VAC 2 amps Master Sla...

Страница 32: ...ttom latch Snap top of transformer into latch arms Feed wiring through hole near the top of the transformer and insert transformer plug into the socket Repeat process for 2nd transformer if using six...

Страница 33: ...C R W T T COM D DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W T T COM T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM 6 Zone ZVR106 PWR TSAT1 ZONE1 TSAT2 ZONE2 TSAT3 ZONE3 T...

Страница 34: ...RIORITY PUMP N L SEC PUMP N STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MO...

Страница 35: ...0 VAC L Line live leg of 120 VAC Thermostat terminals R 24 VAC W Heat call C Common of 24 VAC Boiler terminals XX Dry contacts rated up to 120 VAC 2 Amps Closes when any zone calls including priority...

Страница 36: ...Y ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SLAVE L N PRIORITY pump SECONDARY pump ZV...

Страница 37: ...AT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Preventio...

Страница 38: ...RIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR ON OFF ON OFF L SYSTEM PUMP N MASTER SL...

Страница 39: ...T STAT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Prev...

Страница 40: ...2 C R W T T COM COMMS D P DHW ZR ZC X X T STAT 3 C R W T T COM T STAT 1 C R W T T COM L POWER IN N T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR TSAT1 ZONE1 TSAT2 ZONE2 TSA...

Страница 41: ...acts deliver 120 VAC The SEC PUMP and SYSTEM PUMP are off Once the Zone 1 DHW demand is satisfied power to the PRIORITY PUMP is dropped the DHW contacts open If a demand from zones 2 thru 12 is presen...

Страница 42: ...PUMP N L SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWIT...

Страница 43: ...tral common leg of 120 VAC L Line live leg of 120 VAC Thermostat terminals R 24 VAC W Heat call C Common of 24 VAC Boiler terminals XX Dry contacts rated up to 120 VAC 2 Amps Closes when any zone call...

Страница 44: ...SEC PUMP N SYSTEM PUMP STATUS DURING PRIORITY ZONE 1 END SWITCH MOTOR PRIORITY ZONE 2 END SWITCH MOTOR ZONE 3 END SWITCH MOTOR ZONE 4 END SWITCH MOTOR ZONE 5 END SWITCH MOTOR ZONE 6 END SWITCH MOTOR M...

Страница 45: ...STAT CALL LED s illuminate When the zone valve end switch closes the VALVE OPEN LED illuminates the XX contacts close the SEC PUMP and SYSTEM PUMP terminals deliver 120 VAC DHW Time Out Freeze Prevent...

Страница 46: ...X T STAT 3 C R W T T COM T STAT 1 C R W T T COM L POWER IN N T STAT 4 C R W T T COM T STAT 5 C R W T T COM T STAT 6 C R W T T COM PWR TSAT1 ZONE1 TSAT2 ZONE2 TSAT3 ZONE3 TSAT4 ZONE4 TSAT5 ZONE5 TSAT6...

Страница 47: ...e MOTOR terminals If no other zones are calling power is turned off to the SEC PUMP and SYSTEM PUMP and the XX contacts are opened Description of terminals Ground N Neutral common leg of 120 VAC L Lin...

Страница 48: ...40 Caleffi North America Inc 3883 W Milwaukee Rd Milwaukee WI 53208 Tel 414 238 2360 Fax 44 238 2366 www caleffi com usa sales caleffi com Copyright 2014 Caleffi North America Inc...

Отзывы: