15
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
Maintenance and Repair
: The Caleffi Z-one™ multi-zone pump control
comes with two spare fuses. If control fails or is damaged, replace control with
functional one.
Boiler connections
:
XX = Dry contacts rated up to 120 VAC, 2 Amps.
Closes when any zone calls including priority. Typically
connected to TT on boiler control.
DHW (ZR/ZC) = Dry contacts rated up to 120 VAC, 2
Amps. Closes only when priority is enabled and calling.
Typically used to close ZR\ZC (120 VAC) or DHW contacts (24 VAC) on boiler
controls equipped with these features.
Communication connections:
Connect terminals to matching terminal of slave boards
D to D, P to P, Ground to Ground
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
Input Power
:
L = Line (hot leg) of 120 VAC supply
N = Neutral of 120 VAC
= Ground
Note: when connecting 2 or more Z-one controls, all
controls must be powered by the same 120 VAC circuit.
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
Zone pump outputs
:
Zone pumps run when
corresponding thermostat
initiates a demand.
GROUND = Connect the
ground from the pump to the
ground terminal.
PRIORITY PUMP = Runs when zone #1 calls. Can be programmed to be the
priority zone.
L = Line (hot leg) of 120 VAC to power the pump
N = Neutral leg of 120 VAC to power the pump
Primary pump output:
Primary pump runs when any zone pump runs. Its status
during priority (on\off) can be programmed using the DIP
switches.
L = Line (hot leg) of 120 VAC to power the pump
N = Neutral leg of 120 VAC to power the pump
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
WARNING:
NEVER CONNECT R & C DIRECTLY, this will be a direct short on the 24 VAC
supply.
WARNING:
When connecting 2 or more Z-one controls, all controls must be powered by
the same 120 VAC circuit.
The DIP Switches on the ZSR series
can be positioned for the following
operations.
Master / Slave:
allows for unlimited
expansion to additional ZSR relays.
Priority OFF / Priority ON:
When
priority mode is ON, upon demand,
zone 1 will operate as priority and all other zones are temporarily switched off
(with 1 hour time-out). When priority mode is OFF, all zones remain active.
Primary OFF / Primary ON:
When primary mode is ON, the primary pump will
continue to operate during priority.
Exercise OFF / Exercise ON:
When exercise mode is ON, each circulator is
switched on for 30 seconds following 72 hours of inactivity.
Post Purge OFF / Post Purge ON:
When post purge is ON, the priority pump
continues operating for 2 minutes after the priority zone is switched off.
6 Zone
T-STAT 2
C
R
W
T
T COM
COMMS
D
P
DHW
ZR/ZC
X X
T-STAT 3
C
R
W
T
T COM
T-STAT 1
C
R
W
T
T COM
L
PUMP 2
N
PRIMARY
PUMP
L
PRIORITY
PUMP 1
N
L
POWER IN
N
GROUNDS
L
PUMP 3
N
TRANSFORMER
L
N
T-STAT 4
C
R
W
T
T COM
L
PUMP 4
N
L
PUMP 5
N
L
PUMP 6
N
T-STAT 5
C
R
W
T
T COM
T-STAT 6
C
R
W
T
T COM
PWR
ZONE1
ZONE2
ZONE3
ZONE4
ZONE5
ZONE6
DipSwitches
Master
Slave
Priority OFF
Priority ON
Primary OFF
Primary ON
Exercise OFF
Exercise ON
Post Purge OFF
Post Purge ON
ZSR106
WARNING:
When replacing fuses, make sure power is disconnected to control box.