Installation

Fix the wall support bracket, using the fixing screws supplied in the pack (1).

Insert the rear insulation, through the notch provided (2).

Insert  the  unit  components  in  the  insulation  using  the  special  notches  made  in  the  bracket  and  the  slots  in  the  components.  Block  the

components on the bracket, pulling them downwards to that they click into their housing (3).

Establish the position for installing the expansion vessel at a distance allowed by the length of the flexible pipe, using the bracket provided.

The latter allows the use of expansion vessels with a maximum capacity of 24 l, see the instructions concerning the accessories (4).

Install the pipes of the whole system and connect the solar unit. Secure the components and the pipes to the rear insulation.

Fully tighten all the fittings.

The unit’s threaded fittings are tightened and tested in the assembly phase at the factory. However, when commissioning it is necessary to

check the seal of the fittings, performing a pressure test.

Make the electrical connections of the system, as specified in the regulator instruction manual. Apply the front part of the insulation.

Filling the system

Open the shut-off valve coupled with the automatic air vent, installed in the highest point of the solar thermal system (1).

Open the shut-off and check valves, turning the control stems (2) through 45° (do not remove the temperature gauges).

Fill by means of a pump, using the cock (A) located at the lowest point of the system, until air no longer comes out of the air vent (1). If the

solar  thermal  system  is  made  using  water  premixed  with  antifreeze,  any  top-ups  must  be  carried  out  using  a  mixture  with  the  same

proportions.

Close the shut-off valve of the air vent (3).

Close the cock (A).

aaaaaaa

aa

aaaa

a

a

aaa

aaaaaaa

aaaaaaaaaa

0

20

40

60

80

100

120

140

160

0

20

40

60

80

100

120

140

160

con

forme norme ISPE

SL

0

2

4

6

8

10

bar

CL

 2.5

A

1

13

11

9

7

5

3

l/min

1

2

3

4

1

2

3

Содержание DeltaSol 268050

Страница 1: ...devices for optimum control of the circuit are fitted in the units They are available with flow and return connection or with return connection only Some versions are also complete with the digital r...

Страница 2: ...ges with hydraulic leaks and damage to property and or personal injury Water temperatures exceeding 50 C may cause severe burns When installing commissioning and servicing take the necessary precautio...

Страница 3: ...ment 1 13 l min Flow rate indicator accuracy 10 Pressure gauge scale 0 10 bar Temperature gauge scale 0 160 C Connections 3 4 F Hose connection 3 4 M Fill drain connections with 15 mm hose connection...

Страница 4: ...mperature indication 13 Regulating keys 14 Temperature probe 15 Stainless steel probe pocket code 257004 optional 16 Hose connection only for versions with DeltaSol C regulator 1 2 3 4 5 8 9 11 10 16...

Страница 5: ...d in the assembly phase at the factory However when commissioning it is necessary to check the seal of the fittings performing a pressure test Make the electrical connections of the system as specifie...

Страница 6: ...e deaerated again both in the highest point and on the air separator on the versions where this is contemplated Once deaeration has been completed check the system pressure and if necessary restore to...

Страница 7: ...m every six months by using the deaerator A Full closing and opening of the valve The valve can be completely opened or closed A slot on the obturator stem indicates the status of the valve Correction...

Страница 8: ...e nor me ISPESL 0 2 4 6 8 10 bar CL 2 5 1 13 11 9 7 5 3 l min 1 13 11 9 7 5 3 l min 1 13 11 9 7 5 3 l min a Shut off valve Pump Air vent Expansion vessel Temperature gauge Safety relief valve Automati...

Отзывы: