background image

11

12

Product User Manual

 

Annex 1

The main battery model parameters table

Note: There may be difference between the real product performance and this version due to the design changes, all the parameters are subject to 

our business contact confirmation.

Aluminum

Plastic

Charge

Maximum

charging current

Maximum 

charging voltage

Maximum 

chargingvoltage

Discharge

Maximum 

discharging current

Termination

voltage 

 

Standard Charge

Fast Charge

SOC Recommended

Temperature

Charge

Discharge

Storage 

temperature

Long-term

(within a year) 

Storage humidity range

Short term

(within one month)

72Ah

1 mΩ

135±0.3

29

0

+2

220.85±0.5

1.75Kg

60Ah

0.8mΩ

142±1

50±1

218±2

2.3Kg

180Ah

182±1

71±1

279±2

5.6Kg

200Ah

182±1

71±1.5

279±2

5.7Kg

40Ah

0.9mΩ

116±1

46±1

180.5±2

1.45Kg

60Ah

0.8mΩ

115±1

41±1

244±2

2.0Kg

100Ah

0.6mΩ

142±1

67±1

215.5±2

3.3Kg

180Ah

0.5mΩ

180±1

71±1.5

279±2

5.6Kg

400Ah 

0.4mΩ

450±2

71±1.5

281±2

13.8Kg

0.5mΩ

CAM72

SE60

SE180

SE200

CA40

CA60

CA100

CA180

CA400

Nominal capacity

Internal resistance

Length

Width 

Height

Weight(about)

Type of shell

Nominal voltage

Diameters

(mm)

3.2V

1C

3.65V

2.5V

4h
1h

10%~90%

0°C ~ 45°C

-20°C ~ 55°C

-20°C ~ 45°C

-20°C~ 25°C

<70

2C  

1C

2C

Charging time

Installation for CAM Series single battery can be followed by four steps:

First: Install lower protector as figure 2.

Installation requirements: 

Depress the battery into the lower protector from up to down by force to ensure the battery no slant and below protector wrapping the 

bottom of the battery, no loose connection between protector and battery, and no drop.

Annex 2: Instructions for CAM Series battery protection components installation. 

   This instruction is only applied for the installation of plastic protection components in CAM series Li-on prismatic cells 

manufactured by CALB.

     The protection components for CAM Series are injected molding by flame-retardant ABS + PC material, with flame retardant grade 

level V0, thus protecting battery in the metal shell from instability under shock, impact, high pressure and others.

     The battery protector is divided into four parts, as shown in Figure 1, include: pole protector, upper protector, lower protector, and 

grouping separators.

 

1. Overview

2. Installation for CAM Series battery protection components

2 .1 Installation for CAM Series single battery protection components

Pole Protector 

Upper protector 

Single battery 

Lower protector 

Grouping separators 

Figure 1

Lower protector 

Figure 2

 

Содержание CA100

Страница 1: ...ection components installation 17 Product User Manual China Aviation Lithium Battery Co Ltd CALB Headquarter No 66 North Binhe Road High Tech Zone Luoyang Henan China 471003 Tel 86 0379 6069 7962 Fax 86 0379 6069 7995 http www calb cn http en calb cn ...

Страница 2: ...ment research and production and certifications to enter into international markets including CE RoHS and UN38 3 transportation certification CALB and products have high reputa tion and influence in home and abroad markets Developing green energy is our common history mission Under the strong support of leaders at all levels and partners CALB will take the idea of AVIC Aviation to serve the countr...

Страница 3: ...ing chair battery The charge and discharge mechanism of lithium ion battery can be described as the following chemical formula take lithium iron phosphate for example Lithium ion battery charge and discharge diagram Caution I A BMS battery management system or battery protection system must be used under any circumstance when using or storing battery to ensure the batteries are used under normal c...

Страница 4: ...between 10 90 DOD according to the principle of low depth of charge and discharge 8 Screwing the battery terminal is forbidden without permission 9 Damaging the battery safety valve is forbidden without permission As the case of CAM series battery is metal it is strongly recommended to install a protector when installing CAM series batteries with the specific installation program to ensure the bat...

Страница 5: ...it is recommend using adjustable torque wrench in 5 30N m range the recommended tightening torque values corresponding to specified bolts is shown in the following table 2 7 Power system maintenance period and measures 1 In a routine systematic check and detailed record on the power system usage as well as the work of BMS and charger detect hidden dangers and solve problems in time 2 Regularly che...

Страница 6: ...be prevented from mechanical shock or stress non battery exposure and rain 6 Develop a tracking record of voltage resistance for inventory batteries check the stock battery voltage resistance every three months and make detailed records 7 Conduct a full charge discharge test inventory every six months for inventory batteries at a charge and discharge rate of 0 3C and make detailed records 3 1 Pers...

Страница 7: ...ignated locations within the shortest possible time in mainland China only Time requirements For customers in China mainland CALB will response in two hours within the city in 24 hours within the province three working days or within 30 minutes to give customers a clear answer and reach to the customers within the appointed time outside the province For international customers CALB will response i...

Страница 8: ... 90 0 C 45 C 20 C 55 C 20 C 45 C 20 C 25 C 70 2C 1C 2C Charging time Installation for CAM Series single battery can be followed by four steps First Install lower protector as figure 2 Installation requirements Depress the battery into the lower protector from up to down by force to ensure the battery no slant and below protector wrapping the bottom of the battery no loose connection between protec...

Страница 9: ...rouping separators by one side and clamp the battery by the snap on both sides without falling down The grouping separator should be fitted with the upper and lower separator edge without warping Lower protector Grouping separator Figure 3 Step 3 Install upper protector as figure 4 Installation requirements Push the battery grouping separator by one side and clamp the battery by the snap on both s...

Страница 10: ...rwise it will affect the screw installation causing protectors scratch Install the pole protectors promptly after connecting the bus bars and prevent cascading battery packs from short circuit caused by foreign objects The integrated packs should be placed on a workbench with flat and dry surface The completion of battery packs protector installation is shown above Step 2 Select screws of appropri...

Отзывы: