INSTALLATION OF YOUR NEW GRILL
(continued)
1)
Install side burner into an area of 17-
1/2 long, 11 inches wide and 3 inch
es deep.
2)
Assemble a 3/8 pipe nipple to the
3/8 pipe tee using teflon tape or pipe
sealant. Use only sealant that is
approved for use on LP gas.
3)
Install the pipe tee assembly to the
grill intake pipe with pipe sealant.
Tighten assembly and align the
branch opening of the tee to the hole
of the cabinet.
4)
Connect the flexible hose (male end)
to the pipe tee with pipe sealant.
5)
Install and secure the Side Burner
into the island by simpley setting in
place.
6)
Connect the female end of the
flexible hose to the side burner
intake pipe with pipe sealant.
6)
Connect gas supply to the grill fol
lowing the instructions on page 8.
7)
Check for gas leaks using soap
water solution. (1 part liquid soap, 3
parts water)
Содержание Chef C100
Страница 11: ...CABINET CUT OUT DIMENSIONS FOR GAS GRILL AND ACCESSORIES Side Burner...
Страница 32: ......