2
TABLE OF CONTENT
Thank you for purchasing the air curtain SOLANO CEILING.
This operation manual has been issued by the OUEST VENTIL, Z.I. de la Rangle, 27460 Alizay. The manufacturer reserves the
right to make revisions and changes in the operation manual at any time and without notice, and also to make changes in
the device without influencing its operation.
This manual is an integral part of the device and it must be delivered to the user together with the device. In order to ensure
correct operation of the equipment, get thoroughly acquainted with this manual and keep it for the future.
RECOMMENDATIONS AND REQUIRED SAFETY MEASURES
•
Get acquainted with this operation manual before performing any works at the device.
•
The device may only be installed by qualified personnel with adequate authorisations and skills.
•
In the building where ventilation causes underpressure, air cutrain may have limited efficiency
•
When performing works at the device, remember about your own safety.
•
During installation, electrical connection, connection to the heating medium, start-up, repairs and maintenance
of air curtains, observe the commonly recognized safety standards and regulations.
1. TECHNICAL DATA
............................................................................................................................................................................................................................................................................................................................................
3
2. TECHNICAL DATA
............................................................................................................................................................................................................................................................................................................................................
3
2.1.CONSTRUCTION
.....................................................................................................................................................................................................................................................................................................................................
3
2.2.DIMENSIONS
...............................................................................................................................................................................................................................................................................................................................................
4
2.3.ACOUSTIC PRESSURE LEVEL
.................................................................................................................................................................................................................................................................................................
4
2.4.AIR VOLUME
.................................................................................................................................................................................................................................................................................................................................................
4
2.5.AIR FLOW SPEED
....................................................................................................................................................................................................................................................................................................................................
5
3. HEAT OUTPUT DATA
....................................................................................................................................................................................................................................................................................................................................
5
3.1. AIR COURTAIN SOLANO CEILING-W-100
.........................................................................................................................................................................................................................................................
5
3.2. AIR COURTAIN SOLANO CEILING-W-150
.........................................................................................................................................................................................................................................................
6
3.3. AIR COURTAIN SOLANO CEILING-W-200
.........................................................................................................................................................................................................................................................
6
4. INSTALLATION
.....................................................................................................................................................................................................................................................................................................................................................
7
5. CONTROL SYSTEMS
....................................................................................................................................................................................................................................................................................................................................
9
5.1. CONTROL ELEMENTS
...................................................................................................................................................................................................................................................................................................................
9
5.2. CONNECTING GUIDE
................................................................................................................................................................................................................................................................................................................
10
5.3. CONTROL SYSTEM S-ECM
.................................................................................................................................................................................................................................................................................................
11
5.3.1. REGULATION S-C - WIRING DIAGRAMS SOLANO CEILING-W/N
..........................................................................................................................................................................
12
5.3.2. REGULATION S-C - WIRING DIAGRAMS SOLANO CEILING-E
.....................................................................................................................................................................................
13
5.3.3. REGULATION S-TOUCH - WIRING DIAGRAMS SOLANO CEILING-W/N
........................................................................................................................................................
14
5.3.4. REGULATION S-TOUCH - WIRING DIAGRAMS SOLANO CEILING-E
..................................................................................................................................................................
15
5.3.5. CONTROL SYSTEM - MASTER-SLAVE COMMUNICATION
................................................................................................................................................................................................
16
5.3.6. CONTROL - BMS CONNECTION
...........................................................................................................................................................................................................................................................................
16
5.3.7. CHAINING APPLIANCES
..................................................................................................................................................................................................................................................................................................
17
5.3.8. SETTING BMS ADDRESS
..................................................................................................................................................................................................................................................................................................
18
5.3.9. BMS REGISTERS
............................................................................................................................................................................................................................................................................................................................
18
6. DOOR CONTACT INSTALLATION
..........................................................................................................................................................................................................................................................................................
19
7. GUIDELINES FOR CONNECTION WITH POWER SUPPLY
.....................................................................................................................................................................................................................
19
8. GUIDELINES FOR CONNECTION WITH PIPELINE
...........................................................................................................................................................................................................................................
19
9. OPERATION
.........................................................................................................................................................................................................................................................................................................................................................
20
10.CLEANING AND CONSERVATION
........................................................................................................................................................................................................................................................................................
20
11.OUTLET GRILL ADJUSTING
..........................................................................................................................................................................................................................................................................................................
20
Содержание SOLANO CEILING-E-100
Страница 1: ...AIR CURTAIN TECHNICAL DOCUMENTATION...
Страница 8: ...8 4 INSTALLATION 7 9 11 13 8 10 12 14...
Страница 10: ...10 5 2 CONNECTING GUIDE 1 3 5 7 2 4 6 8 CEILING B W N CEILING B E...
Страница 21: ...21...
Страница 22: ...22...
Страница 23: ...23...
Страница 24: ...Made in Poland Made in EU Manufacturer OUEST ISOL VENTIL Z I de la Rangle 27460 ALIZAY...