12
Rev022520
Disassembling Gate Instructions
Step 1
Illustration
Step 4
Illustration
VII. Disassembling Gate Instructions
NOTICE
Only complete depressurization process if disassembling Smart Gate.
DANGER
System under high pressure. Refer to depressurization instructions in Operations and Maintenance
Manual before doing any maintenance on the gate.
STEP 1.
With gate in the closed position (gate arms horizontal).
a. Remove
3
/
8
” x 2
1
/
4
” hex bolt and
3
/
8
” nylock nut from Dampener Mount Link (as shown in Illustration)
.
STEP 5.
Remove the
3
/
8
”
shoulder bolt from Dampener at Gate end.
IMPORTANT!
RETURN TO INSTALLATION STEPS 13-15 TO INSTALL NEW DAMPENER, AS SHOWN IN THIS
OPERATIONS AND MAINTENANCE MANUAL.
STEP 2.
Rotate gate to the open position (gate arms vertical) before proceeding with Step 3.
CAUTION
CAUTION
High internal gate forces! Before removing Gate Post baseplate fasteners, the gate must be in the open
position (gate arms vertical) so the dampener is in a non-compressed state.
STEP 3.
Remove Gate Post from concrete floor anchors to free up the assembly and lay on the ground to enable
access to the dampener.
STEP 4.
Remove
5
/
16
” x 1” hex bolt and
5
/
16
”
nylock nut from Dampener end.
DANGER
Keep fingers clear of Dampener ends and dampener mount link.
NOTICE
To protect the Powder Coat finish, lay on cardboard.
8
9.3
9.6
9.13
9.14
9.15
© CAI Safety Systems | (951) 465-7386 | https://caisafety.com | [email protected]