![Cadel RIVERIDRO 16 T2 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/cadel/riveridro-16-t2/riveridro-16-t2_installer-manual_3514382002.webp)
new RIVER IDRO T2 - TESIS Airtight T2 - MIRA T2 - MAYA idroT2
2
SUMMARY
1 MANUAL SIMBOLOGY ....................................3
2 PACKAGING AND HANDLING ..........................3
2.1 PACKAGING .............................................................3
2.2 PREPARATION AND UNPACKING .............................3
2.3 STOVE HANDLING....................................................5
3 CHIMNEY FLUE .............................................5
3.1 PREPARING THE SMOKE EXPULSION SYSTEM .........5
3.2 CHIMNEY COMPONENTS .........................................5
3.3 SMOKE DUCT (SMOKE FITTING) ..............................6
3.4 FLUE (CHIMNEY OR PIPED DUCT) ...........................6
3.5 CHIMNEY POT ..........................................................7
3.6 MAINTENANCE ........................................................8
4 COMBUSTION AIR .........................................8
4.1 AIR INLET ................................................................8
4.2 COMBUSTIBLE AIR INLET FOR SEALED-CHAMBER
INSTALLATION ...................................................................9
5 EXAMPLES OF INSTALLATION (DIAMETERS AND
LENGTHS TO BE SIZED) ......................................10
6 INSTALLATION ............................................11
6.1 INTRODUCTION .....................................................11
6.2 MINIMUM DISTANCES ...........................................12
6.3 OVERALL DIMENSIONS .........................................13
6.4 STOVE DOOR REMOVAL/INSTALLATION ................14
6.5 MIRA 16-22 - TESIS 16-23 AIRTIGHT FRAME
ASSEMBLY ........................................................................15
6.6 FITTING THE METAL FRAME OF RIVER IDRO 16-23-23
H
O ..............................................................................16
6.7 FITTING THE MAIOLICA FRAME OF RIVER- IDRO 16 -
23 - 23 H
O .......................................................................16
6.8 MAYA IDRO 16-24 FRAME ASSEMBLY ...................17
6.9 ASSEMBLING TESIS 16-23 AIRTIGHT .....................18
6.10 ASSEMBLING THE TOP CLADDING AND BOTTOM
DOOR ..............................................................................19
6.11 ELECTRIC CONNECTION .........................................19
7 SMOKE OUTLET CONNECTION IDRO MAYA 16 - 24
.................................................................20
8 PLUMBING CONNECTION.............................21
8.1 PLUMBING SYSTEM CONNECTION.........................21
8.2 CONNECTION DIAGRAM RIVER IDRO 16 - 23 - MIRA
16-22 - TESIS 16-23 AIRTIGHT .........................................21
8.3 CONNECTION DIAGRAM RIVER IDRO 23 H
8.4 CONNECTION DIAGRAM IDRO MAYA 16 - 24 ........23
8.5 3 BAR DISCHARGE VALVE ......................................23
8.6 WASHING THE SYSTEM .........................................24
8.7 FILLING THE SYSTEM .............................................24
8.8 WATER CHARACTERISTICS ....................................24
8.9 SYSTEM CONFIGURATION .....................................25
8.10 CONFIGURATION 1.................................................25
8.11 CONFIGURATION 2.................................................26
8.12 CONFIGURATION 3.................................................29
8.13 CONFIGURATION 4.................................................30
8.14 CONFIGURATION 5.................................................32
8.15 CONFIGURATION WITH STORAGE TANK AND
AUXILIARY WALL-MOUNTED BOILER (EXAMPLE) ...........33
8.16 OPERATING MODE .................................................34
8.17 ELECTRICAL CONNECTIONS ...................................34
9 SPECIAL MAINTENANCE ..............................35
9.1 INTRODUCTION .....................................................35
9.2 FUME CONDUIT CLEANING ....................................36
9.3 SMOKE EXTRACTOR COMPARTMENT CLEANING ...36
9.4 CLEANING THE SMOKE EXTRACTION SYSTEM AND
GENERAL CHECKS ............................................................36
9.5 DOOR CLOSING FUNCTIONALITY PERIODIC CHECK 37
9.6 FUME PASSAGES CLEANING ..................................37
9.7 REPLACING THE OVERPRESSURE RELIEF VALVE FOR
THE COMBUSTION CHAMBER ..........................................38
10 BOILER HEAD CLEANING .............................39
11 IN CASE OF ANOMALY ..................................40
11.1 PROBLEM SOLVING ...............................................40
11.2 PROBLEM SOLVING (THERMOSTOVE) ...................43
12 TECHNICAL DATAS ......................................45
12.1 REPAIR INFORMATION ..........................................45
13 ELECTRONIC BOARD ...................................46
14 FEATURES ..................................................47
Содержание RIVERIDRO 16 T2
Страница 51: ...NOTE...