background image

Hex nut

Spring shim

Washer

Expansion bolt

Install four expansion bolts into the 

rough-in base and tighten hex nuts.

Teflon Tape

Hot feeding pipe

Cold feeding pipe

Wrap the coupling with 

Teflon tape and connect 

it to the rough-in base. 

Then connect inlet pipes 

of proper length.

Towards bathtub

Insert expansion bolts into 

Ø8

 holes. 

(Attention 

the “HOT” mark on the 

rough-in base is the hot water inlet 

should face towards the bathtub

)

Level

Level

M8 Screw

Adjust M8 screws on the rough-in 

base to its level position. When 

bubbles inside the level are in the 

center of the circle, the rough-in 

base is at level position, and then 

tighten hex nuts.

Rough-in box

Silicone sealant

Fill silicone sealant in between 

the rough-in box and finish 

floor such as tiles. 

Reference of 

finished floor

For floor work, make sure the center of 

inlet pipes to finished floor is between 

28-50mm. 

Cover

Remove the cover and run 

water for pressure test. 

Check all joints to make 

sure no leakage. Then put 

back the cover. 

Hot feeding pipe

Cold feeding pipe

Flush W

ater

Flush W

ater

Run water to get rid 

of any debris inside 

pipes. Connect cold 

and hot water pipes. 

Attention that the 

HOT mark is to the 

hot water pipe and 

COLD mark to the 

cold pipe.