BS81081841
I. Installation Notice
1.Install water pipes in accordance with this manual.
2.Floor drain should be installed in the location of the faucet.
3.
Rough-in box should be installed before ground construction. The
associated mixer should be installed after the ground construction. The
rough-in box on the inlet base shall not be cut or removed, and shall be
protected to avoid damage to each rough-in box and inlet base during
construction.
4.Clean pipes before installation to get rid of mud,sand or other debris.
5.If the thread of pipes don’t match well with product, please find out the
reason first, otherwise a forced connection will damage the faucet.
6.After installation, check all the joints to ensure they are firmly connected.
Then keep water flow. Turn on and off repeatedly to ensure there is no
leakage around the joints.At this stage, the product is ready for normal use.
7.Keep the manual to the user.
II.
Operation Notice
1.The working condition of this product is water pressure 0.05~1.0MPa,
water temperature 4~90°C.
2.Do not hang heavy things on the faucet.
3.Make sure the faucet is off when no water comes out of it, especially when
nobody resides in or during the period of decoration or suspend of water.
4.Regularly clean the surface of faucet to keep it bright. Attention: do not use
inappropriate tools such as sharp brushes, rough sponges, scouring pads
or corrosive detergent to clean the faucet. It is not recommended to use
the detergent sold in the market, because its formula changes frequently.
Please clean the faucet by a wet cotton cloth with soapy water, then rinse
and dry with a soft cotton cloth after each time of usage.
5.When the room temperature drops to below 0°C, take necessary measures
(such as keeping faucet warm and closing windows) to prevent the faucet
from being frozen or even broken (especially when windows kept open for
air ventilation while nobody resides in).
6.Please open the cold and hot water in turn and adjust to comfortable
temperature before use to avoid scald.
7.Do not disassemble the product without the help from the professionals..
III.
Installation Diagram
IV. Installation Steps
(
Fig.1-19
)
:
The installation diagram is only for reference.
The product is subject to the real object.
Prepare and check
the following tools.
Drill
Goggles
Spanner
Teflon Tape
Level
Silicone
Sealant
Pencil
Saw Blade
S6 Wrench
(supplied)
S5 Wrench
(supplied)
S4 Wrench
(supplied)
S2.5 Wrench
(supplied)
Mark position based on the mounting
holes of the rough-in base and drill
four
Ø8
holes. (Attention
the “HOT”
mark on the rough-in base is hot water
inlet should face towards the bathtub.)
M8 Screw
Mounting hole
Rough-in base
Ø8
hole
Last revision: November 13th
#30311
Floor mount tub filler with hand shower
INSTALLATION GUIDE